Installing Cisco TelePresence MX300 - Floor Stand
The MX300 delivery
1 Unpacking the floor stand box and mounting the floor stand
2 Unpacking the MX300 box with the LCD video unit, Touch controller and accessories
3 Mounting the LCD video unit to the floor stand
The MX300 with a floor stand is delivered in three boxes with the following parts:
•Floor stand column, floor stand base and floor stand covers. Screws and Allen key
•LCD video unit, touch controller, microphones and cables. Screws, screwdriver and gloves
•Back cover
Manpower
Two people working together are required to mount the LCD video unit to the floor stand column.
Dimensions
Height (without camera): 1420 mm / 56 in.
Width: 1290 mm / 51 in.
Depth: 730 mm / 29 in.
Weight: 42 kg / 93 lb
iUnpack the floor stand box with the floor stand base, floor stand column and floor stand covers, screws and Allen key.
iiPlace the floor stand base on the floor with the cable channel facing upward and backward.
iiiRaise the floor stand column with the cable channel facing backward. Place the column on the base and make sure the holes for the screws are aligned.
ivFasten the column to the base using the four screws (tool: Allen key).
Floor stand
column
iCut the straps and lift off the outer covering.
iiRemove the upper foam protection.
Note: Leave the LCD video unit in the bottom tray for now.
iiiLift out the rectangular box behind the LCD video unit.
This box contains two smaller boxes: One with the Touch controller, and one accessories box with the microphones, cables, screws and screwdriver.
Touch controller with cable
Outer covering
Accessories box:
•Two microphones
•Power cable
•Presentation cable
(VGA to
•Ethernet cable
•Four screws for fastening the LCD video unit to the floor stand
•Hexagonal screwdriver
•Two pairs of gloves
Note: Always use the provided gloves when handling the LCD video unit to avoid stains on the unit’s surface.
iLift the LCD video unit from the bottom tray and slide it onto the top of the floor stand column.
Two people working together are
required for this operation. | 31 kg / 68 lb |
iiRemove the cable channel lid (see illustration) to get access to the holes for the screws.
iiiFasten the LCD video unit to the column using the
four screws (tool: hexagonal screwdriver). | LCD video |
| unit |
Cable channel lid (for strain relief)
Documentation
The user documentation for this product, including compliance and safety information, is available on the Cisco web site, http://www.cisco.com/go/telepresence/docs.
Floor stand | Front |
base |
|
The two floor stand covers will be mounted in step 6.
LCD video unit
Bottom tray
Floor stand