3
Water drain
The machine is equipped with a drain valve
❏The diameter of the main drain should be adapted to the water flow and the number of machines. It should be sufficient to handle at least 160L/min. per machine.
❏It is necessary to connect the main drain at least on one side to an open
❏When the main drain has not been sufficiently deodorized, eve- ry machine should be installed seperately with a deodorizer.
Electrical Connection
❏Remove the cover plate at the back of the machine. (See dimen- sions (E)).
❏Connect the power cable to the connectors.
220V 3AC
220V 3 phase (3AC) should be connected to the connectors “L1,L2,L3”.
The green/yellow grounding clamp has to be connected to the grounding wire “PE”.
380 V 3AC + N
380 V 3 phase (3AC + N) has to be connected to the connectors “L1,L2,L3”, the blue neutral to the “N” connector.
The green/yellow grounding clamp has to be connected to the grounding wire “PE”.
❏After connection, check the spin direction. The cylinder must spin in the direction of the arrow, showed on the sticker on the door window (clockwise).
❏A wrong spin direction can damage the motor, and can also cause water to spurt from the soap dispenser.
Power of the breaker plugs:
machine with steam heating or boiler fed machines without additional electrical heating
220V 3AC 380V 3AC + N
16 A | 16 A |
machine with electrical heating
| 220V 3AC 380V 3AC + N | |
9kw | 25A | 16A |
12 kW | 40 A | 20 A |
15 kW | 50 A | 25 A |
18 kW | 50 A | 32 A |
21 kW | 40 A | |
24 kW | 40 A |