Cobra Electronics CPI 400 Quick Evaluation Before Installation, Be Sure to Have on Hand

Models: CPI 400

1 12
Download 12 pages 1.01 Kb
Page 5
Image 5
Quick Evaluation

Quick Evaluation

Quick Evaluation Before InstallationTo Check Your Inverter’s Performance Before Installation: Before Installation

Introduction

Quick Evaluation Before Installation

Quick Evaluation

Be Sure to Have on Hand:A 12 volt DC power source (such as a vehicle battery). Before Installation

Introduction

To Check Your Inverter’s Performance Before Installation:

This section provides you with basic information about the inverter and how to check its performance before installation.

Be Sure to Have on Hand:

A 12 volt DC power source (such as a vehicle battery).

Power Supply

The power source must provide

 

between 11 and 15 volts DC and

 

be able to supply enough current to

 

run the test load. As a rough guide,

 

divide the wattage of the test load by

 

10 to get the current (in amperes)

 

the power source must deliver.

The provided 2 ft. cigarette lighter cable.

Cable

Only use the cables provided with

 

 

 

your inverter. The cigarette lighter

 

 

 

cable is suitable for operating the

 

 

 

inverter at loads up to 150 watts.

 

 

 

Connect by securely inserting the

 

 

 

plug into the cigarette lighter socket.

 

 

 

CAUTION Do not use the cigarette lighter cable

 

 

 

 

 

 

for loads higher than 150 watts. When connecting

 

 

 

 

 

 

loads larger than 150 watts, please connect the

 

 

 

inverter directly to the battery.

A test load that can be plugged into the AC receptacle on the inverter for short term testing at a low power level.

Test Load

On/Off Switch to Off

Connect Terminals

Connect Power Source

On/Off Switch to On

Connect Test Load

1.Turn the inverter Off (see page 11 for details). If the power source is a DC power supply, switch it Off as well.

2.Connect cables to Power Input Terminals (see page 8 for details).

3.Connect cable to power source (see page 8 for details).

4.Check to make sure all connections are secure.

5.Turn the inverter On. If the power source is a DC power supply, switch it On first.

6.Plug in the test load.

The inverter should supply power to the load. If the inverter is not working properly, refer to the Troubleshooting Guide on page 14 or Power and Protection Indicators section on page 12.

4 English

Nothing comes close to a Cobra5

Page 5
Image 5
Cobra Electronics CPI 400 Quick Evaluation Before Installation, Be Sure to Have on Hand, inverter directly to the battery