5 LOWER CHUTE (See Fig. 5)
1.Raise and hold deflector shield in upright position.
2.Place slot in lower chute over tab on mower deck and position lower chute over deck opening as shown.
3.Hook rear latch into flange hole on back of mower deck.
4.Hook front latch into tab hole on front of mower deck.
CAUTION: Do not remove deflector shield from mower. Raise and hold
shield when attaching lower chute and allow it to rest on chute while in
operation.
UPPER CHUTE (See Figs. 6A & 6B)
1.Lower mower deck to its lowest cutting position.
2.Assemble upper chute by inserting curved end into hole in back of cover.
NOTE: Handle carefully so as not to damage full bagger indicator.
3.Push in and turn upper chute until it is in line with lower chute.
4.Align the bosses on lower chute with alignment slots on upper chute and slide together.
5.Secure with rubber latch by hooking hole in latch over latch pin.
FULL BAGGER
UPPERINDICATORHANDLE
CHUTE
DEFLECTOR
SHIELD
OP_ONALFRONT
GAUGEWHEEL
TAB
COVER
\
FRONT
LATCH
;EAR LATCH
FIG. 5
LOWER
CHUTE
FIG. 6A
ALIGNMENT
SLOT
_ / LATCH PIN
FIG. 6B
LEVEL MOWER DECK
Be sure deck isproperly leveled for best mower performance. See your tractors owner'smanual for instructions.
7