B. Assembly of CPVC/PVC Vent Systems

WARNING

Failure to follow the instructions could result in flue gas leakage into the combustion air or indoor air, resulting in unsafe or unreliable operation.

All CPVC vent components (supplied with the boiler) must be used for near boiler vent piping before transitioning to Schedule 40 PVC (ASTM 2665) components for the remainder of the system.

The use of cellular core PVC (ASTM F891) is prohibited.

The use of CPVC is required where venting passes through chase ways and through walls with clearances less than shown in Figure 1.13.

Never leave the boiler in operation without the silicone gas sample cap in place (Figure 1.17, 1.18)

1.Install the vent adaptor and intake adaptor on the boiler.

BWC070, 090, 120, 151 - If the CPVC/PVC vent/intake adaptor is not factory installed, install the vent/intake adaptor as shown in Figure 1.17.

a.If the boiler has been supplied with a different vent adaptor, remove the six #10 sheet metal screws which attach it to the boiler. Remove the old adaptor from the boiler (this may be easier if a twisting motion is applied to the collar while removing it).

b.Attach the self adhesive gasket supplied with the stainless steel vent/intake adaptor to the bottom of the adaptor.

c.Lubricate the brown gasket in the female end of the plastic vent stub (inside the boiler) with a few drops of water.

d.Push the vent/intake adaptor onto the boiler with a slight twisting motion. Make sure that this vent adaptor is inserted at least 1” into the boiler stub.

e.Secure the collar flange to the top of the boiler with the (6) #10 x 1/2” sheet metal screws supplied with the vent kit or those removed in Step (a).

f.Verify that the silicone gas sample cap is in place (Figure 1.17).

BWC150, 225 - Install the vent and air inlet adaptors as shown in Figure 1.18.

a.Remove the hose clamp shipped on the BWC150 or 225 vent collar.

b.Bend the three hose clamp tabs on this collar outward slightly.

c.Clean the exterior of the male end of the CPVC adaptor with an alcohol pad.

d.Apply a ¼” wide bead of high temperature silicone approximately ½ inch from the male end of the adaptor.

Also apply a ¼” bead of silicone along the first 2 ½” of the longitudinal weld.

e.Insert the male end of the adaptor into the boiler vent collar until it bottoms out.

f.Apply an additional bead of silicone over the outside of the joint and smooth out.

g.Replace and tighten the clamp on the vent collar.

h.Verify that the silicone gas sample cap is in place (Figure 1.18).

i.Attach the 1/2” ID Clear tubing provided to the condensate drain connection (Upper 1/2” tube) as shown in Figure 1.18. Secure with one of the hose clamps provided.

j.Route the tubing down the right side panel and into the 1-3/8” knockout located in the lower portion of this panel. Be sure to remove all burrs from the knockout to prevent the hose from being punctured.

k.Remove the plug and black gasket ring from the bottom of the condensate trap located under the boiler (Figure 1.24)

l.Replace the original gray trap plug with the white tapped plug. Screw the 90 degree hose barb provided into this white plug (Figure 1.24).

m.Attach the other end of the 1/2” ID tubing to the 90 degree hose barb and secure with the remaining hose clamp (Figure 1.24).

n.Slip the air inlet adaptor into the intake collar on the top of the boiler as shown in Figure 1.18. Secure with at least one #10 sheet metal screw.

14

Page 16
Image 16
Crown Boiler BWC225, BWC150 manual Assembly of CPVC/PVC Vent Systems

BWC225, BWC150 specifications

The Crown Boiler BWC series, specifically the BWC150 and BWC225 models, are renowned for their performance and efficiency in residential and commercial heating applications. These boilers are designed to provide optimal heating while ensuring reliability and user-friendliness.

A standout feature of the BWC series is its high efficiency. Both the BWC150 and BWC225 are equipped with cutting-edge technology that maximizes energy use, effectively reducing operating costs. Their design utilizes a modulating burner, which adjusts the heat output based on demand. This modulation not only enhances comfort levels by maintaining a steady temperature but also conserves energy, making these models eco-friendly options.

The BWC series incorporates a durable cast-iron heat exchanger, known for its longevity and excellent heat transfer capabilities. This feature ensures that the boilers can withstand the rigors of daily operation while delivering consistent performance over time. Furthermore, the built-in control systems allow for precise monitoring and adjustment, ensuring that users have access to real-time information about their heating systems.

Another notable characteristic is the compact design of these boilers. The BWC150 and BWC225 fit seamlessly into various spaces, making them ideal for both new installations and replacements in existing systems. The straightforward installation process is a significant advantage for contractors and homeowners alike, saving time and resources.

Moreover, safety is a priority in the design of the BWC series. Each model includes multiple safety features, including low water cut-off, high-temperature limit control, and pressure relief valves. These features not only protect the boiler itself but also ensure the safety of the home or building in which it operates.

The Crown Boiler BWC series also boasts compatibility with various heating systems, including hot water baseboard, radiators, and in-floor heating, providing versatility to meet different heating needs. Its user-friendly interface and control options make it accessible to users, whether they are tech-savvy or not.

In conclusion, the Crown Boiler BWC150 and BWC225 models offer a combination of energy efficiency, robust construction, and advanced technology. With their modulating burners, durable heat exchangers, compact design, and safety features, these boilers are an excellent choice for anyone looking to invest in a reliable heating solution.