The Vent Option #1 column in Table 6.2a describes a horizontal direct vent system using 3” vent pipe. From this column, we see that a BWC150 may have a vent length of up to 55ft. The first 90 elbow and the termination elbow are not considered. From Table 6.6, the equivalent length of the 3” 45 elbow is 4ft and the equivalent length of the 3” 90 degree elbow is 5.5ft. The maximum allowable run of straight pipe on this system is therefore:

55ft – 4 ft – 5.5ft = 40ft

Since the planned installation has only 14 ft of straight pipe, the planned vent length is acceptable.

FIGURE 6.1: HORIZONTAL DIRECT VENTING (VENT OPTIONS 1,2)

3)Minimum Vent and Air Intake Lengths - Minimum vent length is 2ft. Minimum air inlet length is 2ft.

4)Permitted Terminals for Horizontal Venting (Vent Options 1,2) - The vent terminal is either a tee or an elbow supplied by the vent system manufacturer and equipped with a rodent screen. Vent system manufacturer’s part numbers for these fittings are shown in Table 6.5. In some cases, the elbows and tees shown in Table 6.5 require separate rodent screens. When this is the case, vent manufacturer part numbers for these additional parts are shown in Table 6.5 along with the termination fitting.

The air intake fitting on a horizontal vent systems is always a 90 degree elbow with a rodent screen. This elbow is made out of the same material as the rest of the air inlet system (either galvanized or PVC) and is installed as shown in Figure 6.1.

5)Horizontal Vent and Air Intake Terminal Location - Observe the following limitations on the vent terminal location (also see Figure 6.3):

Vent terminals must be at least 1 foot from any door, window, or gravity inlet into the building.