
Assembly & | 3 |
| |
|
|
Contents of Crate |
|
• | One Snow Thrower | • | Two Replacement Auger Shear Pins | • | One Chute Assembly |
• | One Snow Thrower Operator’s | • | One Product Registration Card | • | One Chute Control Rod |
| Manual |
|
|
|
|
•One Engine Manual
Assembly
Handle
1.Place the shift lever in the
2.Remove the lower plastic wing nut and carriage bolt from each side of the upper handle; then raise the upper handle assembly until it snaps over the lower handle. See Figure
|
| Figure |
|
| Chute Control Head |
|
| Chute Support |
| Figure | Bracket |
|
| |
| NOTE: Make certain the cables are seated properly in the |
|
| roller guides. See Figure |
|
3. | Looking beneath the handle panel, check that all of the |
|
| cables (steering, auger, shift, and drive) are properly routed |
|
| and not pinched or kinked. | Chute |
4. | Secure the handle by tightening the plastic knob located |
|
| on both the left and right sides of the handle. Remove |
|
| and discard any rubber bands, if present. They are for |
|
| packaging purposes only. |
|
Chute Assembly | Chute Base |
|
1.Remove cotter pin, wing nut and hex screw from chute
control head. Remove clevis pin and | Figure |
from chute support bracket. See Figure |
|
7