DCS CGT manual Installing The Tandoor

Models: CGT

1 14
Download 14 pages 48.24 Kb
Page 7
Image 7

Installing The Tandoor

UNPACKING

Check that the container is upright. Use outward prying no hammering to remove the carton. Check the Tandoor for visible damage. If such damage has occurred, do not refuse shipment, but contact the carrier and file the appropriate freight claims. Do not contact the factory, as responsibility for shipping damage is between the carrier and dealer or end user. Remove, unwrap, and temporarily set aside any accessories shipped with the Tandoor.

POSITIONING

Do not push against the edges of the unit in an attempt to adjust its position. Lift it slightly and place it where it is to be installed. Although all metal parts are deburred during manufacture protective gloves are recommended when ever positioning or moving unit. Accidents could occur if the Tandoor should move suddenly while being pushed into position by hand. Pushing a unit (rather than using a lift jack) also increases the probability of bending the leg spindles or the internal coupling connectors.

LEVELING

A carpenters spirit level should be placed across the top of the Tandoor and the unit leveled both front to back and side to side. If its not level, burner combustion may be erratic or the unit may not function efficiently. If the floor is level and smooth, level the unit with the screw thread of the legs; adjust the high corner and measure with the spirit level. If the floor is uneven or has a decided slope, level the unit with a metal shim; the adjustment required may exceed the thread available in the leg, and / or a castered line-up may not return exactly to the same position after being moved, requiring re-leveling after each move.

GAS CONNECTION

The gas supply (service) line must be the same size or greater than the inlet line of the appliance. The Tandoor uses a 3/4NPT inlet, however, the gas supply lines must be sized to accommodate all the gas fired equipment that may be connected to that supply. Consult your contractor, gas company, supplier, or other recognized authorities. Sealant on all pipe joints must be resistive to propane gas. When using thread compound on gas piping, use very small amounts and only on male threads. Use a pipe thread compound that is not affected by the chemical action of L.P. gases. Do not apply pipe thread compound to the first two pipe threads. This will prevent clogging of the burner ori- fices and the control valve.

MANUAL SHUT-OFF VALVE

Supply shut-off valve must be installed on the gas service line ahead of the appliance in the gas stream to shut off supply in the event of an emergency.

6

Page 7
Image 7
DCS CGT manual Installing The Tandoor

CGT specifications

DCS CGT, or Digital Combat Simulator Combined Arms Ground Team, represents a significant advancement in military simulation technology and training. This cutting-edge platform is designed to provide realistic and immersive environments for training ground forces, allowing users to experience various combat scenarios with an unparalleled level of detail and authenticity.

One of the main features of DCS CGT is its high-fidelity graphics engine, which offers stunning visuals that accurately depict a variety of terrains and landscapes. From arid deserts to urban environments, the simulation incorporates realistic terrain modeling, weather effects, and dynamic lighting conditions. This enables users to train in environments that closely resemble real-world combat zones, enhancing preparedness and situational awareness.

DCS CGT's technology stack includes advanced physics modeling and AI-driven opponents, making enemy interactions more compelling and life-like. Soldiers in training can expect to encounter smart AI that reacts to player actions, providing an unpredictable adversarial dynamic. This not only boosts the training experience but also encourages more strategic thinking and adaptability among participants.

Human-computer interaction is enhanced through the use of versatile control systems. Users can engage in ground combat using a variety of vehicles and equipment, from armored personnel carriers to tanks. The simulation allows for detailed vehicle handling, weapon systems integration, and communication protocols, ensuring operators gain first-hand experience working with modern military technologies.

DCS CGT also features multiplayer capabilities, enabling users to collaborate or compete against one another in large-scale operations. This aspect fosters teamwork and communication, essential skills for effective ground operations. Additionally, mission customization tools allow trainers to design scenarios tailored to specific objectives or tactical lessons, providing flexibility in training programs.

Another characteristic of DCS CGT is its integration with other DCS modules, allowing joint warfare training scenarios alongside air and naval units. This integration provides a coalesced view of modern warfare environments, where ground forces must work alongside air support and naval assets for mission success.

In conclusion, DCS CGT is a comprehensive training tool that leverages advanced technologies to create a realistic, immersive, and adaptable combat simulation. With high-fidelity graphics, intelligent AI, versatile control systems, and a focus on teamwork, it equips military personnel with the skills and experience necessary for success in today’s complex battlefields.