Before You Begin

Consider the following best practices before setting up your SC100/SC120 expansion enclosure.

Before connecting any cables between the storage system and expansion enclosure, physically label each port and connector.

Always follow proper power-up and power-down procedures when cycling power across the network. Verify that critical network components are on separate power circuits.

NOTE: This product is intended for restricted access locations, such as a dedicated equipment room or equipment closet.

WARNING: If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer.

Other Information You May Need

Additional information you may need to install the expansion enclosure.

NOTE: See the safety and regulatory information that shipped with your Storage Center components. Warranty information is included as a separate document.

The Dell Storage Center SCv2000/SCv2020 Storage System Deployment Guide provides information about cabling Storage Center hardware components and configuring a new Storage Center using the Dell Storage Client.

The Dell Storage Center Dell Storage Client Administrator’s Guide describes how to use the Dell Storage Client to manage a Storage Center.

Installation and Configuration

Before you begin the installation, make sure that the site where you plan to install the expansion enclosure has standard power from an independent source or a rack power distribution unit with a UPS.

Unpacking Storage Center Equipment

Unpack the expansion enclosure and identify the items in your shipment.

3

Page 3
Image 3
Dell SC120, SC100 manual Before You Begin, Unpacking Storage Center Equipment