LOADING AND UNLOADING GRAIN

ï With the gate indicator in the closed position, fill the

box with grain.

ï With the PTO disengaged, extend auger.

ï Start PTO at a slow rate of speed until the upper

and lower drives are engaged.

ï Increase PTO speed and open the inner gate

halfway. When grain begins to flow, open gate to

full position.

ï Once grain stops flowing, return gate to closed

position.

ï Never exceed 1000 RPM on the system.

ï Never fill grain cart unless inner gate is closed.

WARNING: BE CERTAIN ALL POWER

IS OFF WHEN CONNECTING PTO OR

HYDRAULIC LINES TO TRACTOR

ï Connect Grain Cart to tractor using a good quaility

hitch pin. Attach a safety chain.

ï Attach power take-off shaft to tractor. Check tractor

drawbar and adjust to allow clearance.

ï Raise jack stand and place to rear storage

position.

ï Make sure no debris is in the grain cart.

ï Attach hydraulic lines to tractor.

ï Connect lighting hook-up to tractor.

1
48
53
46
4
GRAIN CART ASSEMBLY
For Extension Breakdown See Page 12
For Window
Installation See
Page18
5
8
8
17
39
3
6
53
63
7
46
47
2
1
58
14
52
9
74
39
10
19
15
47
10
55
10 69
51
11 12
13
45
53
53
55
17
16
18
23
16
55
43
17
54
55
54 56
54 58
55
54
22
20
67
25
21
24
44
26
57
31
27
32
33
28
50
49
45
46
47
64
60
61,62
47
68
57
64
59
76
66
47
For Dial Indicator
Installation See
Page 17
69
12
44
75 75
74