Desa CHDV36NRA INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2, Installing Remote Receiver

Models: CHDV36NRA

1 40
Download 40 pages 50.53 Kb
Page 21
Image 21
Pressure Testing Fireplace Gas Connections

FIREPLACE INSTALLATION

Checking Gas Connections (Cont.) Installing Optional Wireless Hand-Held Remote Control - (C)GHRCB and (C)GHRCTB Series

21

FIREPLACE INSTALLATION

Continued

Equipment

Shutoff

Valve

Gas

Meter

Gas Valve

Figure 35 - Checking Gas Joints for Natural Gas Fireplace

Pressure Testing Fireplace Gas Connections

1.Open equipment shutoff valve (see Figure 33, page 20).

2.Open propane/LP supply tank valve for propane/LP fireplace or main gas valve located on or near gas meter for natural gas fireplace.

3.Make sure control knob of fireplace is in the OFF position.

4.Check all joints from equipment shutoff valve to gas valve (see Figure 34 for propane/LP or Figure 35 for natural gas). Apply noncorrosive leak detection fluid to all joints. Bubbles forming show a leak. Correct all leaks at once.

5.Light fireplace (see Operating Fireplace, pages 25 through 27). Check all other internal joints for leaks.

6.Turn off fireplace (see To Turn Off Gas to Appliance, page 25).

INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2

1.Connect one terminal of 25 ft. wire for the wall switch to the TPTH terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire termi- nals are in the positions on the unit as pictured in Figure 36. If wires are not connected as shown the switch will not work.

To Wall Switch

Accessory

Figure 36 - Connecting Wall Swith to Control Valve

2.Route the 25 ft. wire through openings provided on the sides of the burner system to a convenient location to mount your switch.

3.Connect one bare wire end to each of the terminals of the GWMS2 wall switch.

4.Install the wall switch and cover in the wall.

INSTALLING OPTIONAL WIRELESS HAND- HELD REMOTE CONTROL - (C)GHRCB AND (C)GHRCTB SERIES

NOTICE: Use only alkaline batteries (not included).

Installing Remote Receiver

1.Open bottom louver and locate the switch bracket on the left.

2.Unscrew the switch bracket. Lean bracket forward so you are able to access the back of the remote receiver.

3.Locate the battery clip mounted on the back of the receiver. Slide a 9-volt alkaline battery (not included) through the clip (see Figure 37).

4.Attach the terminal wires to the battery.

5.Remove wire from TH to TPTH on control valve (see Figure 37).

6.Connect wires from receiver to TH and TPTH to control valve (see Figure 38).

7.Replace the switch bracket.

Receiver

9-Volt Alkaline

Battery

Terminal Wires

Battery Clip

Figure 37 - Attaching Alkaline Battery to Receiver

To Optional

Remote

Accessory

Figure 38 - Control Valve Terminals

INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2For moreInstalling Remote ReceiverManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

111252-01A

Page 21
Image 21
Desa CHDV36NRA INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2, Pressure Testing Fireplace Gas Connections, Continued