14

INSTALLATION

Checking Gas Connections (Cont.) Installing Logs

INSTALLATION

Continued

Pressure Testing Heater Gas Connections

1.Open equipment shutoff valve (see Figure 18).

2.Open main gas valve located on or near gas meter for natural gas or open propane/LP supply tank valve.

3.Make sure control knob of heater is in the OFF position.

4.Check all joints from equipment shutoff valve to thermostat gas valve (Thermostat-Controlled Models), to control valve (Manually-Controlled Models), or to gas control (Remote- Ready Models)(see Figures 19 and 20). Apply noncorrosive leak detection fluid to all joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Light heater (see Operating Heater, pages 16 through 21). Check all other internal joints for leaks.

7.Turn off heater (see To Turn Off Gas to Appliance, page 17 for Thermostat-Controlled models, page 18 for Manually-Controlled Models, or page 20 for Remote-Ready Models).

Equipment

ShutoffOpen

Valve

Closed

Figure 18 - Equipment Shutoff Valve

Equipment

Thermostat Gas

Valve or Control

Shutoff Valve

Valve Location

 

Gas Meter

 

Figure 20 - Checking Gas Joints (Natural Gas Only)

INSTALLING LOGS

WARNING: Failure to position the parts in accor- dance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury.

Each log is marked with a number. These numbers will help you identify the log when installing. It is very important to install these

Propane/LP Supply Tank

Equipment

 

Shutoff Valve

Thermostat Gas

 

 

Valve or Control

 

Valve Location

logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

1.

Place front log (#1 for 18", #1a and #1b for 24" and 30") on

 

top of the grate. Make sure the notches in the bottom of the log

 

fits over the grate prongs (see Figure 21, page 15). Push back

 

of logs flush with metal grate bar. Logs for 24" and 30" should

 

fit with ends touching and a small realistic crack in the center.

2.

Rest middle log (#2) behind metal posts on front burner. Make

 

sure the grooves in the bottom of the log fit over the grate.

 

Bring the log forward next to the metal posts. The cutout in the

 

middle log must be on top (see Figure 22, page 15).

3.

Slide the grooves in the back of the rear log (#3) against the

 

rear grate prongs. Make sure the peg on the log is on top (see

 

Figure 23, page 15).

4.

Place the crossover log (#4) on the back log and the middle

 

log. Make sure the peg on the rear log is in the hole in the

Figure 19 - Checking Gas Joints (propane/LP only)

bottom of the crossover log. The crossover log should fit in the

cutout of the middle log (see Figure 24, page 15).

For..com

104415-01H

Page 14
Image 14
Desa R installation manual Installing Logs, Pressure Testing Heater Gas Connections

R specifications

Desa R is an innovative urban development designed as a model for sustainable living. Located in a prime setting, it combines modern technology with an eco-friendly approach, making it a standout community in today's urban landscape. The main features of Desa R revolve around sustainability, community engagement, and smart city solutions.

One of the cornerstones of Desa R is its commitment to sustainability. The development incorporates extensive green spaces, which not only promote biodiversity but also provide residents with recreational areas. Parks, gardens, and tree-lined streets are thoughtfully distributed throughout the area, encouraging outdoor activities and community gatherings. The design emphasizes walkability, reducing the need for vehicular transportation and promoting healthier lifestyles.

Desa R utilizes advanced technologies to enhance the living experience. Smart home systems are integrated into residential units, allowing for control of lighting, heating, and security through mobile applications. This technology not only contributes to energy efficiency but also provides residents with convenience and peace of mind. Additionally, smart waste management systems are in place, utilizing sensors to optimize waste collection routes and minimize environmental impact.

The development also prioritizes renewable energy sources. Solar panels are installed on rooftops, harnessing sunlight to provide clean energy for homes and shared facilities. This not only reduces energy costs for residents but also contributes to the community's overall carbon footprint reduction.

Community engagement is another integral aspect of Desa R. A variety of communal spaces, such as coworking hubs, community centers, and event venues, facilitate social interaction and collaboration among residents. Regular workshops and events are organized to foster a sense of belonging and encourage skill-sharing among community members.

Transport in Desa R is designed to be efficient and sustainable as well. The area is well-connected with public transport options, including electric buses and cycling paths, making it easier for residents to travel without relying heavily on personal vehicles.

In summary, Desa R embodies the future of urban living, characterized by sustainability, technological integration, and community-oriented design. It serves as a blueprint for future urban developments, demonstrating that modern living can harmonize with the environment and foster strong community ties.