Desa VFP24MV, VFP18MV, VFP30MV Installation, Continued, Installing Logs, Installing Front Log #1

Models: VFP18MV VFP24MV VFP30MV

1 24
Download 24 pages 11.74 Kb
Page 13
Image 13
INSTALLING LOGS

OWNER’S MANUAL

INSTALLATION

Continued

INSTALLING LOGS

Figure 17 - Installing Front Log (#1) WARNING: Failure to posi- tion the parts in accordance with these diagrams or failure to use only parts specifically approved with this heater may result in prop- erty damage or personal injury.

Each log is marked with a number. These numbers will help you identify the log when installing. It is very important to install these logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

1.Place front logs (#1L and #1R) on top of the grate. Make sure the notches in the bottom of the logs fit over the grate prongs (see Figure 17). Push back of logs flush with metal grate bar. Note: 18" model has only one front log.

2.Rest bottom middle log (#2) behind metal posts on front burner. Make sure the grooves in the bottom of the log fit over the grate. Bring the log forward next to the metal posts. The pegs on the log must be on top (see Figure 18).

3.Slide the grooves in the back of the rear log (#3) against the rear grate prongs. Make sure the peg on the log is on top (see Figure 19).

4.Place the top middle log (#4) on the bottom middle log (#2). Make sure the pegs of the bottom middle log fit se- curely in the holes of the top middle log (see Figure 20).

5.Place the crossover log (#5) on the back log and the top middle log. Make sure the peg on the rear log is in the hole in the bottom of the crossover log. The crossover log should fit in the cutout of the top middle log (see Figure 21).

Front Log (#1)

Notch

Grate

Prongs

Metal Grate Bar

Figure 17 - Installing Front Log (#1)

Bottom Middle

Log (#2)

Groove

Groove

Metal

Post

Metal Post Figure 18 - Installing Bottom Middle Log (#2)Figure 19 - Installing Rear Log (#3)Figure 20 - Installing Crossover Log (#4) Grate

Figure 18 - Installing Bottom Middle Log (#2)

Peg

Rear Log (#3)

Groove in

Groove

in Back

Back of Log

of Log

 

Grate Prong

 

Grate

Prong

Figure 19 - Installing Rear Log (#3)

Hole

Top Middle

 

Log (#4)

Peg

Figure 20 - Installing Crossover Log (#4)

Crossover

Log (#5)

Hole

Cutout

Peg

Figure 21 - Installing Crossover Log (#5)

105071

13

Page 13
Image 13
Desa VFP24MV, VFP18MV Installation, Continued, Installing Logs, Installing Front Log #1, Installing Bottom Middle Log #2