Desa (V)K42P SERIES Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows

Models: (V)K42P SERIES

1 40
Download 40 pages 37.84 Kb
Page 12
Image 12

12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION

INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90°

ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1)

Horizontal (H1) +

 

 

 

Horizontal (H2)

45°Elbow

5' min.

2' max.

6' max.

 

6' min.

4' max.

12' max.

 

7' min.

6' max.

18' max.

 

8' min.

8' max.

20' max.

 

20' max.

8' max.

20' max.

 

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

For..com

111921-01D

Page 12
Image 12
Desa (V)K42P SERIES installation manual Horizontal System Installation Using TWO Elbows, Venting with Two 90 Elbows