Desa VP2200ITB Vent-Freepropane/Lp Gas Heater, Installation, Continued, Connecting To Gas Supply

Models: VP1600ITB VP2200ITB

1 24
Download 24 pages 5.34 Kb
Page 10
Image 10
CONNECTING TO GAS SUPPLY

®

VENT-FREE PROPANE/LP GAS HEATER

INSTALLATION

Continued

CONNECTING TO GAS SUPPLY

Manual background WARNING: This appliance re- quires a 3/8" NPT (National Pipe Thread) inlet connection to the pressure regulator.

Manual background WARNING: A qualified service person must connect heater to gas supply. Follow all local codes.

Manual background CAUTION: Never connect heater directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator be- tween the heater and propane/LP supply.

Manual background CAUTION: Use only new, black iron or steel pipe. Inter- nally-tinned copper tubing may be used in certain areas. Check your local codes. Use pipe of large enough diameter to allow proper gas volume to heater. If pipe is too small, undue loss of pres- sure will occur.

Typical Inlet Pipe Diameters

VP1600ITB

3/8" or greater

VP2200ITB

1/2" or greater

Installation must include equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from heater (see Figure 14).

IMPORTANT: Install an equipment shutoff valve in an accessible location. The equip- ment shutoff valve is for turning on or shutting off the gas to the appliance.

Apply pipe joint sealant lightly to male threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged heater valves.

Manual backgroundCAUTION: Use pipe joint seal- ant that is resistant to liquid pe- troleum (LP) gas.

Install sediment trap in supply line as shown in Figure 14. Locate sediment trap where it is within reach for cleaning. Locate sedi- ment trap where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into heater controls. If sediment trap is not installed or is installed wrong, heater may not run properly.

IMPORTANT: Hold pressure regulator with wrench when connecting it to gas pip- ing and/or fittings.

The installer must supply an external regu- lator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incom- ing gas pressure, heater regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure

13.Pointing the vent down protects it from freezing rain or sleet.

Propane/LP

Supply Tank

External

Regulator

Vent

Pointing

Down

Figure 13 - External Regulator With Vent Pointing Down

Pressure Regulator

 

Regulator Bracket

 

 

 

3/8" NPT

Heater

Pipe Nipple

Cabinet

 

 

 

Ground Joint

 

 

Union

 

Tee Joint

 

Test

Reducer

Equipment Shutoff Valve *

Bushing to

Typical Inlet Pipe

Gauge

1/8" NPT

Connection *

From

 

 

 

 

1/8" NPT

External

 

Plug Tap

Regulator

 

 

(11" W.C. to

 

Tee Joint

14" W.C.

Sediment

Pressure)

Pipe Nipple

3" Minimum

Trap

 

Cap

Figure 14 - Gas Connection

*A CSA/AGA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the optional CSA/AGA design-certified equipment shutoff valve from your dealer. See Accessories, page 23.

10

104247

Page 10
Image 10
Desa VP2200ITB, VP1600ITB Vent-Freepropane/Lp Gas Heater, Installation, Continued, Connecting To Gas Supply