Desa (V)V42P, (V)V42N Clearances, Framing And Finishing, Pre-Installation Preparation, Continued

Models: (V)V42P CHDV42NR (V)V36P (V)V42N CHDV36NR

1 44
Download 44 pages 21.85 Kb
Page 5
Image 5
CLEARANCES

PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

5

PRE-INSTALLATION

PREPARATION

Continued

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top of Standoffs

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace .

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your pri- mary heating system. Do not install this fireplace as your primary heat source. If you have a central heat- ing system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows framing for corner installation. All minimum clearances must be met.

For available accessories for this fireplace, see Accessories on pages 42 and 43. If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombustible mantels at any height above the fireplace.

Note: Noncombustible mantels may discolor!

36" Models 42" Models

A

36 1/8"

40 1/8"

B

41 1/4"

48 1/4"

C

23 1/2"

25 5/8"

A

BC

Figure 4 - Framing Clearances for Installation Against an Exterior Wall

BDC

A

E

F

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

Nailing Tabs

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

36" Models

42" Models

 

 

 

 

 

 

 

A

 

35 3/4"

 

 

 

 

41 5/8"

 

 

 

 

 

 

 

 

B

 

15"

 

 

 

 

21 5/8"

 

 

 

 

 

 

 

 

C

 

49 5/8"

 

 

 

 

58 1/2"

 

 

 

 

 

 

 

 

D

 

10 3/8"

 

 

 

 

13 1/2"

 

 

 

 

 

 

 

 

E

 

13 3/4"

 

 

 

 

16 3/4"

 

 

 

 

 

 

 

 

F

 

41"

 

 

 

 

48"

 

 

 

 

 

 

 

 

 

G

 

41 1/4"

 

 

 

 

48 1/4"

 

 

 

 

 

 

 

 

H

 

68 1/2"

 

 

 

 

81 1/2"

 

 

Figure 5 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

 

 

 

 

 

 

 

 

 

 

 

1

14" (356mm)

 

A

 

16" (406mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

12" (305mm)

 

B

 

14" (356mm)

 

 

 

 

 

3

10" (254mm)

 

C

 

12" (305mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

8" (203mm)

 

D

 

10" (254mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

6" (152mm)

 

E

 

8" (203mm)

 

 

 

 

 

6

4" (101mm)

 

F

 

6" (152mm)

 

 

 

 

 

7

2" (51mm)

 

G

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Clearances for Combustible Mantels

FRAMING AND FINISHINGFor moreManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

108861-01D

Page 5
Image 5
Desa (V)V42P, (V)V42N, (V)V36P, CHDV36NR, CHDV42NR Clearances, Framing And Finishing, Pre-Installation Preparation, Continued