Volvo
Installing the Remaining 4” Ductwork and Grills
The location for the additional discharge grill or grills (one for the 10,000 BTU AC and two for the 14,000 BTU AC) is up to the installer or owner. Based on our experience with this truck chassis, we recommend the following (Fig. 17):
Up through the
Low on the floor, driver’s side, in front of the cabinets
You will need to install a new plenum on top of the CHEB unit. Use a ¼" nut driver to remove the plastic 7" hose adaptor. Remove the top cover plate with the four screws, and reinstall on the side hole. Find the 4 x 4 x 4"
Important! Refer to the Dometic instal- lation manual for details in connecting ductwork to the discharge grills and CHEB plenum.
Figure 17 - 4" ducts installed low on the floor on the driver’s side
Figure 18a - Installing the air distribution plenum
Figure 18b – Installing the air distribution plenum
Figure 19 - CHEB with ductwork installed
ENGLISH | 11 |