Scissor Lift by Draper

Installing Optional Ceiling Closure Panel— Size "B" or "E"

If your Scissor Lift is equipped with a "B" or "E" ceiling closure panel, it can be used as is, or in conjunction with a piece of existing ceiling tile.

If installing with ceiling tile, you may need to cut tile so overall dimensions are

the same as (or slightly less than) the closure panel. Place tile into trim frame. Lay closure panel on top (back side) of tile & tighten screws to hold in place.

Attach provided angle brackets to side of bottom of Scissor Lift.

For larger units, attach short angle brackets to ends of long angle brackets.

Attach 5/16" threaded rods to angle bracket.

Run unit “up” until bottom pan stops at highest position. Mark position on 5/16" rods even with ceiling level and cut to length (remove from pan if convenient).

Run unit “down” until bottom pan stops at “show” position.

Attach closure to lower end of 5/16" rods by slipping into four corner slots and secure with nuts above and below slots.

Run unit “up” again to highest position. Measure distance by which panel fails to reach required “closed” height for surrounding ceiling.

Run unit “down” then re-adjust mounting of 5/16" rods in traveling grid to raise panel required distance.

Test unit operation to confirm that panel will stop in closed position just before touching ceiling.

NOTE: Immediately upon completion of the surrounding ceiling, unit should be operated to confirm that optional ceiling closure panel stops just short of touching ceiling in closed position.

Installing Optional Ceiling Closure—All other Sizes

Your Scissor Lift can be equipped with an optional ceiling closure system. To install it:

Remove closure and all mounting hardware from carton.

Optional ceiling closure can be mounted in either of the following styles:

A.If ceiling tile is to be inserted in the closure, this may be done now, or later when the rest of the ceiling is installed (permitting a better match). Cut tile so that its overall dimensions are the same as (or slightly less than) the closure panel. Attach to the closure panel with adhesive.

B.Position one pre-cut aluminum tee along outside edge of panel so arm extends under and rests on the panel (or tile if tile is being used). Be careful not to compress the tile. Drill three holes through rib of tee into edge of panel and pop rivet into place (or use self-tapping screws).

C.Follow same procedure with remaining 3 tees.

NOTE: Since tees comprise part of exposed trim, care should be taken to ensure accurate fit.

Attach two (2) mounting angles to the corresponding holes in the bottom

pan with the supplied hardware.

Threaded Rod

Closure Pan

Optional Acoustical Tile by Others

page 3 of 6

Bottom Pan of

Scissor Lift

Angles with

Pre-drilled Holes

Installer to Drill Holes

Tee Moulding

(w/Mitred Corners)

Pop Rivets or Screws

Supplied by Others

Attach other two (2) mounting angles at 90° to previous angles (right to left) in the corresponding holes with the supplied hardware.

Attach one of four 3/8" threaded rods by passing the rod through one of the four corner holes, in the angles and secure with nuts top and bottom.

Approximately ½" of rod should extend above angle.

E, G, J

Ceiling Finish Kit

Run unit “up” until bottom pan stops at highest position. Mark position on

3/8" rod that is even with ceiling level and cut rod to length (removing it from

pan if convenient). Cut remaining three rods to same length.

Run unit “down” until bottom pan stops at “show” position. Secure all four 3/8" rods to traveling pan in same fashion as first one.

Attach closure to lower end of each 3/8" rod using two remaining nuts on each rod to firmly clamp fixtures on top of panel.

Run unit “up” again to highest position. Measure distance by which panel

fails to reach required “closed” height for surrounding ceiling.

Run unit “down” then readjust mounting of 3/8" rods in traveling grid to raise panel required distance.

NOTE: Rods should not extend more than 1" above the angles attached to the pan. Cut extra rod off if necessary.

11Test unit operation to confirm that panel will stop in closed position just before touching ceiling.

Installing Optional Ceiling Finish Kit

Threaded Rod

Trim Frame

Closure Pan

Installer to Drill Holes

Bottom Pan of

Scissor Lift

Angles with

Pre-drilled Holes

8-32 Weld Studs

Tee Moulding

(w/Mitred Corners)

The Scissor Lift is available with a ceiling finish kit, which consists of the lower section of the plenum housing (trim frame) and the closure panel.

Install Scissor Lift as previously described in these instructions.

Install trim frame in opening. This can be accomplished by suspending with wire or mounting directly to ceiling joists (if space permits).

Install projector and attach optional ceiling closure panel to Scissor Lift. See above for appropriate ceiling closure instructions.

Pop Rivets or Screws

Supplied by Others

Optional Acoustical

Tile by Others

www.draperinc.com (765) 987-7999

Page 3
Image 3
Draper SLX Installing Optional Ceiling Finish Kit, Installing Optional Ceiling Closure Panel- Size B or E