ASSEMBLY

PEDESTAL AND PANELS

Pedestal Base Installation:

1. Slide the front part of the pedestal base around the pedestal and fix the rear part with the two supplied screws.

2. Slide the ash pan in position.

Side Panels and Ash Lip

Installation:

1. Start by fixing the front part of the decorative side in the two clips welded on the sides of the fire box.

2. Then, fix the back of the decorative side with two screws and washers

supplied. Line up the decorative side parallel to the side of the appliance.

3. Clip the ash lip into position, centred just below the door.

5

Page 6
Image 6
Drolet WOODSTOVES owner manual Assembly, Pedestal and Panels