EarthQuake 3365PSCE Maintenance And Storage, Maintenance Schedule, Maintenance Operation, Page

Models: MODEL 3365CE 3365 3365B 3365PSCE MODEL 3365KPS MODEL 3365K MODEL 3365PS R3355H

1 28
Download 28 pages 1.32 Kb
Page 12
Image 12
MAINTENANCE AND STORAGE

OPERATor INSTRUCTIONS and parts

Front Tine Models 3365_3365B_3365K_3365KPS_3365CE_3365PS_R3355H_3365PSCE

MAINTENANCE AND STORAGE

MAINTENANCE SCHEDULE

Your rototiller has been designed and produced by the industry’s leading manufacturer of outdoor power equipment to provide you with years of reliable operation.

Keeping your tiller in top running condition will prolong its life, and help you obtain optimum performance.

Please read this normal care schedule, and note the recommended care operating intervals to extend the life of your unit.

Maintenance Operation

Page

Before

50 hours or

Each Use

Every Season

 

 

Check belt tension

13

X

 

 

 

 

 

Change forward belt

13

 

x

 

 

 

 

Engine maintenance

14

x

x

 

 

 

 

Check oil level/change oil

14

x

2

 

 

 

 

Clean tine axle shaft

14

x

 

 

 

 

 

Lubrication

14

 

x

 

 

 

 

Check throttle control adjustment

-

 

1

 

 

 

 

EM = See engine manual

1 Adjust throttle control after first three hours of operation or if engine is hard to start or run-on occurs.

2 Change oil after the first five to eight hours of use, then after every 50 hours or every season. Change oil every 25 hours when operating under heavy load or in high temperatures.

SERVICING THE ROTOTILLER

The following information will help you make the necessary checks and perform the procedures required to follow the normal care recommendations made for your rototiller unit.

If you prefer, your local authorized dealer can make these checks and perform the required procedures for you.

!WARNING

To prevent accidental starting:

Engine must be turned off and cool, and spark plug wire must be removed and secured from spark plug before checking and adjusting engine or equipment.

Page 12

800-345-6007

GetEarthquake.com

Page 12
Image 12
EarthQuake 3365PSCE Maintenance And Storage, Maintenance Schedule, Maintenance Operation, Page, Before, hours or, Each Use