OPERATION | ||
5. Align groove (H) in |
| |
G | ||
Do not force connection.. | ||
6. Hold main pipe, and turn | H | |
| ||
positive locking channels until connection is firm. |
| |
Note: Blower use will eventually loosen pipe connections. |
| |
Exclusive positive locking system allows pipes to be | Blower Pipe (main) | |
tightened. If loosening occurs, remove | ||
| ||
and install according to instructions 5 & 6. |
| |
| Blower Pipe |
Remove Blower Pipes
1. Release locking ring (C) with a coin or screwdriver, and rotate ring so that lock symbol (A) is at top of ring.
2. Remove pipes from locking ring.
OPERATION
Moving parts can amputate fingers or cause severe injuries. Keep hands, clothing and loose objects away from all openings. Always stop engine, disconnect spark plug, and make sure all moving parts have come to a complete stop before removing obstructions, clearing debris, or servicing unit.
Blower housing may contain shredder blades and other sharp edges that can cause serious injuries if touched, even if engine is off and blades are not moving. Wear gloves to protect hands from sharp edges and hot surfaces.
X7501183502 | 13 |
© 4/2013 ECHO Inc.