Power Blower

9

Operator's Manual

Contents

____ 1 - Power Head

____ 1 - Flex Pipe

____ 1 - Pipe w/swivel

____ 1 - Straight Pipe

____ 1 - Straight Pipe w/decal

____ 1 - Operator's Manual

____ 1 - Warranty Registration Card

____ 1 - Plastic Bag

____

2

- Clamps w/screws

____

1

- Guide Loop

Assembly

WARNING

Never perform maintenance or assembly procedures with engine running or serious personal injury may result.

install blower pipes

GG

1.Place guide loop (G) across elbow clamp, and turn until clips fully engage clamp band.

2. Assemble clamps (A) onto both ends of flexible pipe (B).

 

 

 

 

 

 

 

 

 

 

 

 

 

A

G

B

A

 

 

 

 

 

 

 

 

NOTE

 

 

 

 

 

 

 

 

 

 

Clamp with cable guide loop (G) fits elbow end of flexible pipe.

3.

Assemble swivel pipe (C) into flexible pipe (B).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE

 

 

 

Assure throttle cable is not twisted before installing handle (E).

 

E

 

 

 

B

4.

Position cable between the elbow (D) and frame and along the top

 

 

 

of the flexible pipe. Loosen knob (H) on handle (E). Align notch in

 

F

handle with tabs (F). Install onto swivel pipe (C) past long ridges in pipe.

DC H