EdgeStar CWR265SZ owner manual Installation, Operation

Models: CWR265SZ

1 12
Download 12 pages 37.71 Kb
Page 6
Image 6
Installation

Installation

Clear unit of any loose packaging materials.

Confirm you have all required loose parts and pieces.

Place the unit on a flat, dry surface that is able to support the unit while fully loaded.

This unit is designed to be either recessed or free standing.

Avoid placing heavy objects on top of the unit.

The unit is not designed for use in a basement or garage.

The unit is not designed to be in direct sunlight or near sources of heat.

Avoid placement near other heat-emitting appliances.

Do not share outlets with other powerful appliances.

Let stand for at least 24 hours before powering up to let cooling materials settle.

Gently clean the unit’s interior surface with warm water, using a soft cloth before first use.

Operation

1.Insert racks into unit.

2.Adjust temperature.

3.Place bottles to be cooled inside unit.

4.Plug the power cord into a standard grounded electrical outlet.

5.Keep door closed to keep optimal temperature and conserve energy.

6.Toggle the internal light by pressing the button on the front control panel.

Important Note: Allow at least 24 hours for the internal temperature to become adjusted properly before first use.

5

Page 6
Image 6
EdgeStar CWR265SZ owner manual Installation, Operation