6 | List of Materials |
|
List of Materials
Parts included in your hood
•Hood structure assembly with blower, transition.
•4 Lamps already installed.
•
•4 Duct covers.
•2 Bottom.
•2 Top.
•Hardware bag with:
•Ceiling Mount Template
•Use, care and installation guide
•Wood screws (4 pieces - 3/16” x 1” 3/4)
•Assembly screws (74 pieces)
•4 Plastic Springs to attach duct covers
•8 Vertical supports.
•2 Upper Ductcover supports.
•2 Horizontal supports.
Optional accessories
•Recirculation KIT
•
•
Tools/Materials required
•Aluminum tape
•Wire nuts
•Tape to mount template
•1/2” electrical connector (junction box)
•8” rounded metal duct (length to suit installation)
•Measuring tape
•Pliers
•Gloves to protect against sharp edges
•Knife
•Safety glasses
•Electric drill with 5/16” and 3/8” bits
•Strain relief 1/2” conduit connector
•Level
•Phillips (Pozidrive) # 2 screwdriver + torx # 2
•Wire cutter/stripper
•Masking tape
•Hammer
•Saw, jigsaw or reciprocating saw
Lamp
Vertical supports
Duct cover support
Upper Duct cover supports
Duct
Covers
Grease
Filter