Standby Generator Sets

Installation

START-UP CHECKLIST

Before working on the generator, ensure the fol- lowing:

The AUTO/OFF/MANUAL switch is in the OFF position.

The 120VAC supply to the battery charger is switched OFF.

‹PREPARATION FOR START-UP

Ensure that the 120VAC circuit breaker to the bat- tery charger is open.

Remove the fuse from the the control panel. For the H-100 and R-100: Open the front door of the control box and remove the 15 Amp ATO fuse in the lower left-hand corner of the control box.

Connect the battery cables to the battery. Attach negative battery cable last.

Close the 120VAC circuit breaker to the battery charger.

Measure the voltage at the battery before and after the charger is turned on.

Verify all AC electrical connections are tight at the circuit breaker and transfer switch.

Visually inspect entire area looking for loose paper, plastic wrappings, leaves, etc.

Check all hoses clamps fittings for leaks or dam- age.

Check all electrical plugs throughout the genera- tor. Ensure each plug is seated correctly and fully inserted into its receptacle.

Verify the AUTO/OFF/MANUAL switch is in OFF position.

Open the valve to the engine fuel line.

Bleed the fuel system of air. (necessary for long fuel lines).

Open the generator main line circuit breaker.

Connect a manometer to the gas line and record the static pressure. It must be as listed in the Specifications.

Insert the fuse into the control panel.

Move the AUTO/OFF/MANUAL switch to the MAN- UAL position. The engine should now crank and start.

Check voltage at the generator terminals.

For 3-phase units, check phase rotation at the transfer switch terminals. The generator phase rotation must match the utility phase rotation.

Check for coolant, fuel, oil, and exhaust leaks.

Close the generators main line circuit breaker.

Turn the generator set off.

Connect the UTILITY supply to the transfer switch.

Set the AUTO/OFF/MANUAL switch to AUTO.

Disconnect utility power before the transfer switch.

Engine should start, transfer to load.

Run at least 15 minutes on generator power. Make certain all 3-phase loads are functioning correctly (correct phase rotation).

Reconnect Utility power

Transfer switch will transfer back to Utility and engine will shut down within the given time parameters set up for the specific transfer switch and controller.

Install all covers, access plates and door panels.

Put the Owners Manual in a safe and accessible place.

Make certain the AUTO/OFF/MANUAL switch is in the AUTO position.

‹START-UP INSPECTION

When a start-up is performed by an Authorized Service Dealer, a standard three-part form titled “Start-up Inspection for Standby Power Systems” (part no. 067377), should be completed by the instal- lation technician or engineer. See page 1-3 for infor- mation on locating the nearest Authorized Service Dealer. The installer should complete the form and disseminate copies as follows:

White copy: Mail to Generac Warranty Department, P.O. Box 340, 211 Murphy Dr., Eagle, WI 53119- 2062.

Pink Copy: For service file of installing dealer.

Yellow Copy: For the customer’s records.

11/05 A .Rev Install001

8-2

Page 14
Image 14
Elite 005212-0 owner manual START-UP Checklist, ‹ Preparation for START-UP, ‹ START-UP Inspection

005212-0 specifications

Elite 005212-0 is a standout model within the elite line of high-performance devices, designed to cater to both professional users and tech enthusiasts. Boasting an impressive array of features, technologies, and characteristics, it has quickly established itself as a noteworthy contender in the competitive landscape of cutting-edge technology.

At the heart of the Elite 005212-0 is its robust processing unit, equipped with a next-generation multi-core processor that ensures seamless multitasking and rapid execution of applications. With a clock speed that can reach up to 4.5 GHz, users can expect a fluid performance, whether they are handling resource-intensive tasks or everyday activities. This powerful processor is complemented by an advanced Graphics Processing Unit (GPU) that enhances visual performance, making it ideal for gaming, video editing, and graphic design.

One of the key highlights of the Elite 005212-0 is its expansive memory options. Featuring high-speed RAM of up to 32 GB, users can experience a significant boost in performance, allowing for efficient data handling and faster access to applications. The device also offers large storage solutions, including both solid-state drives (SSDs) for speed and traditional hard drives (HDDs) for ample capacity, ensuring users have the flexibility to select a configuration that meets their needs.

Connectivity is another area where the Elite 005212-0 excels. It supports the latest Wi-Fi standards, providing users with enhanced internet speeds and stability, while multiple USB ports, including USB-C, enable quick and easy connections to a variety of peripherals. Additionally, it features Bluetooth technology for wireless pairing with accessories such as headphones and speakers.

The Elite 005212-0 is designed with user accessibility in mind. Its ergonomic build ensures comfort during prolonged usage, and it often includes features such as a full HD display for crisp visuals, backlit keyboards for low-light environments, and advanced cooling systems that keep the device running efficiently and quietly.

With various operating system options, including Windows and macOS compatibility, users can choose the platform that best fits their workflow. The Elite 005212-0 also prioritizes security, incorporating biometric authentication options, such as fingerprint sensors, to protect user data.

Overall, the Elite 005212-0 stands as a testament to innovation and performance. Its blend of processing power, ample memory, extensive connectivity, and user-focused design makes it an exceptional choice for anyone seeking a high-quality device that can handle a variety of tasks with ease.