INSTALLATION (continued)
GREEN REDREDREDRED
observe | operate |
these lights | this switch |
GREEN | RED |
Figure 1-7. Standard controls and indicators.
3 --- Electrical Operation
This procedure will check the electrical operation of the Automatic
Be sure to close the enclosure door before proceeding to prevent personal injury in case of electrical system fault.
Transfer Test
Both normal and emergency sources must be available and the emergency source generator (if used) must be capable of being started in this procedure.
Perform steps 1 through 5 at the right. Observe the status lights.
QBlack square means light is on. S White square means light is off.
**If you do not want
This completes the Functional Test of the ACTS.
The Transfer Switch Connected
1To Normal and Normal Source Accepted lights should be on.
Turn and hold Transfer Control switch clockwise to Transfer Test
2until the engine starts and runs (within 15 sec.). Emergency Source Accepted light should come on.
Transfer switch CE closes and then Transfer Switch CN opens
3Emergency light should come on and the Transfer Switch Connected to Normal light goes off (you might see and hear the brief overlap transfer). **
Transfer switch will operate back to Normal position after Feature 3A time delay. For immediate retransfer turn Transfer Control
4counterclockwise to Retransfer Delay Bypass. The Transfer Switch Connected To Normal light should come on; Transfer Switch Connected to Emergency light should go off.
The
5(unloaded running engine cool- down). The Emergency Source Accepted light should go off.