ACTUATOR ASSEMBLY continued . . .

5.See the typical drawing for Switchpak SW20N assembly on page 15, and the typical wiring diagrams on page 16 for DC supply and page 17 for AC supply. Install all wiring according to the electrical diagram and local regulations.

6.Check shaft alignment of the electronic controller to speed reducer by rotating both shafts independently, without binding occurring in the connector. Adjust if necessary.

7.With the Switchpak, the optional local control station and/or the digital display aligned on the Switchpak pedestal, tighten all mounting bolts, nuts and setscrews.

8.Pour seal enclosure (315), or tag.

9.Tag power supply connection wires in enclosure (334), install plug (303) and tag as power supply field connection point.

10.Install entry plugs (301, 302, 309) in the Switchpak SW20N enclosure (300) and tag as communication field connection point.

3