![](/images/new-backgrounds/1196321/19632117x1.webp)
Installation
Figure 4 Communication cable connection
| RMP_X1_J1 |
4 | 485- |
| |
3 | 485+ |
| |
2 | Shield |
| |
1 |
|
Up to 328ft. (100m)
Shield 485+
485-
UPS_U2_J24 |
1 |
2 |
3 |
4 |
2.5Mounting the RMP on Drywall
To hang the RMP on drywall or similar surface:
1.Drill four holes
2.Insert the four
3.Insert one screw into each anchor and tighten firmly.
4.Remove the four hooks from the RMP, reverse them, then reattach them to the RMP.
5.Hang the RMP on the wall by slipping the hooks over the heads of the screws and lowering the RMP slowly until the screws are seated in the slotted portion of the hooks.
Figure 5 Mounting hole dimensions
EmersonTM | Liebert NX |
Network Power |
|
Remote Monitor Panel
S TATUS | SILENCE ON/OFF |
F1 F2 F3 F4 HELP
12"
(306mm)