Empire Comfort Systems VFSR-18-3 CLEARANCES continued, Heat Resistant Material, Or Firebox

Models: VFSR-18-3 VFSR-16-3

1 24
Download 24 pages 46.1 Kb
Page 8
Image 8
CLEARANCES (continued)

CLEARANCES (continued)

Sidewall & Ceiling Clearances (Figure 3)

18", 24", 30"

Log

41"

16"

Log

36"

 

 

 

Figure 3

The sides of the fireplace opening must be 6" from any combustible wall. The ceiling must be at least 36" (for the 16" log) and 41" (for 18",

Non-Combustible

Requirements for

Material Distance

Safe Installation

 

 

12" or more

Non-combustible material.

 

 

Less than 12"

Non-combustible material must be extended

 

to at least 8" with the installation of the

 

optional fireplace hood. If you cannot extend

 

non-combustible material at least 8", you

 

must operate heater with flue damper open.

 

 

Mantel Clearances with Hood (Figure 5)

You must have non-combustible materials above the fireplace opening. Non-combustible material must extend at least 8" above fireplace opening. With sheet metal, you must have non-combustible material behind it.

Heat resistant materials such as slate and marble must be at least 1/2"

thick. Sheet metal should not be installed onto combustible material.

Example: A mantel may project from the wall a maximum of 2" at a minimum of 13-1/2" above the opening, and a maximum of 6" at a mini- mum of 15" above the opening.

24" and 30" logs) from the fireplace opening.

Mantel Clearances Without Hood (Figure 4)

You must have non-combustible materials above the fireplace opening. Non-combustible material must extend at least 12" above fireplace opening. With sheet metal, you must have non-combustible material

HEAT RESISTANT MATERIAL

8" Mantel

6" Mantel

4" Mantel

2" Mantel

behind it.

Heat resistant materials such as slate and marble must be at least 1/2" thick. Sheet metal should not be installed onto combustible material.

10" and less Mantel

HEAT RESISTANT MATERIAL

12" WITHOUT28"

HOOD

12"

HEATER IN FIREPLACE

OR FIREBOX

Figure 4

If your installation does not meet the above clearances, you must pro- ceed to one of the following steps:

Use a hood

Operate the heater with flue damper open. See page 10 for Installing as a Vented Appliance.

Raise the mantel to the proper height.

Remove the mantel.

Page 8

8" WITH HOOD14.25" 16.0"

13.5" 15.0"

HOOD

HEATER IN

FIREPLACE

OR FIREBOX

Figure 5

If your installation does not meet the above minimum clearances, you must proceed to one of the following steps:

Operate the heater with the flue damper open. See page 10 for Installing as a Vented Appliance.

Raise the mantel to the proper height.

Remove the mantel.

Floor Clearance (Figure 6)

If installing heater at floor level, the minimum distance to combustibles is “0” inches.

Figure 6

14008-0-0403

Page 8
Image 8
Empire Comfort Systems VFSR-18-3 CLEARANCES continued, Heat Resistant Material, Mantel 6 Mantel 4 Mantel 2 Mantel