Envision Peripherals IM1603 Electrical Data, Water Presure Drop - Hydronic Coil, Hydronic Models

Models: IM1603

1 22
Download 22 pages 10.44 Kb
Page 12
Image 12
Water Presure Drop - Hydronic Coil

ENVISION SERIES AIR HANDLER INSTALLATION MANUAL

Hydronic Models

Water Presure Drop - Hydronic Coil

Flow gpm

 

 

 

Pressure Drop (PSI)

 

 

 

 

 

 

 

 

 

 

 

 

40°F

50°F

60°F

 

100°F

 

110°F

120°F

130°F

 

 

 

 

 

 

 

 

 

 

 

 

 

3.0

0.5

0.5

0.5

 

0.4

 

0.4

0.4

0.4

4.5

0.9

0.9

0.9

 

0.8

 

0.8

0.8

0.8

 

 

 

 

 

 

 

 

 

 

6.0

1.4

1.4

1.4

 

1.2

 

1.2

1.2

1.2

 

 

 

 

 

 

 

 

 

 

9.0

2.8

2.6

2.5

 

2.4

 

2.4

2.4

2.3

 

 

 

 

 

 

 

 

 

 

12.0

4.6

4.4

4.2

 

4.0

 

4.0

4.0

3.9

 

 

 

 

 

 

 

 

 

 

15.0

7.0

6.8

6.6

 

6.0

 

6.0

5.9

5.8

 

 

 

 

 

 

 

 

 

 

Coil Capacity vs. Entering Water Temperature

 

 

 

Entering Water Temperature °F

 

 

EAT °F

100

110

 

120

130

 

140

150

 

 

 

 

 

 

 

 

 

65

44%

56%

 

69%

81%

 

94%

106%

 

 

 

 

 

 

 

 

 

70

37%

50%

 

63%

75%

 

87%

100%

 

 

 

 

 

 

 

 

 

Electrical Data

All field wiring must comply with local and national fire, safety and electrical codes. Be sure the available power is the same voltage and phase as that shown on the unit serial plate. Refer to the unit Electrical Data table for fuse and cir- cuit breaker sizing. The thermostat should be connected to the air handler and to the compressor section. Line voltage

power should be supplied to the breakers on air handlers with 15kW and 20kW heater kits (see the electric heat control section picture). On air handlers with no electric heat installed, or with 5kW and 10kW heater kits the power should be supplied to L1 and L2 lugs on PB (see air handler control section picture).

Air Handler Control Section:

Power should be supplied to PB on air handlers with no electric heat and 5kW or 10kW heaters.

Electric Heat Control Section:

Power should be supplied to the breakers on air handlers with 15kW and 20kW heaters.

11

Page 12
Image 12
Envision Peripherals IM1603 Electrical Data, Water Presure Drop - Hydronic Coil, Hydronic Models, Flow gpm, 100F, 110F