Verifying the Installation

This method is similar to activating real subscribers. In order to use this method the following preconditions have to be fulfilled:

The PEM installation has succeeded

The PEM configuration of the network has been done

The servers in the network are running

All registration has been transferred to the PEM

The Service Configuration Manager is used for this task.

Alternatively the Bulk Configuration Manager can be used instead of the Service Configuration Manager and may simplify the task of configuring an end-user with a service for each line; please see the Bulk Configuration User’s Guide for further details.

Please refer to Local Craft Tool User’s Guide and the PEM User’s Guide for detailed information of how to use them.

Table 3

Verification with the ECN320 Local Craft Tool

 

Verification Activity

Comments

 

 

Perform continuity check on each line from

Best to perform after rewiring and

the Exchange MDF to the Line MDF

before installing nodes

 

 

Verify that the green LED is lit on the IP

Green – The IP DSLAM has booted

DSLAMs

 

and received an IP address and SW

 

 

Verify (if possible) that the ECN320 switch

Active Ethernet connection is

port where the IP DSLAMs are connected,

verified

indicates active Ethernet connection

 

 

 

Recommended to perform check on each

Testing the IP DSLAM functionality

ADSL line

 

 

 

Recommended to perform continuity check

Test that the new installation has

on each POTS or ISDN line

not affected the old services

 

 

Start the Status Manager and use the Flash

Test of the registration process

LEDs button to verify the MDF position of the

 

IP DSLAMs (verification of the registration)

 

 

 

 