|
|
|
| Raise the Perimeter and |
|
|
|
|
|
| ASSEMBLY INSTRUCTIONS | Roof Rafters: |
|
|
|
|
|
| • At each corner, lift the |
|
|
| |
|
|
| N!ERGY PORTABLE CANOPY |
|
|
| |
|
|
| bottom section of the |
|
|
| |
|
|
|
|
|
|
| |
|
|
|
| perimeter rafter until the |
|
|
|
|
|
|
|
|
|
| |
Component List: 1 Canopy Top, 1 Frame Assembly, 1 Carry Bag | lock button on the leg |
|
|
| |||
clicks into its seat in the |
|
|
| ||||
w/Wheels, 1 |
|
|
| ||||
collar. See g. 4 & 5. Take |
|
|
| ||||
Stakes, 4 Guy Out Skewers, 4 Attached Guy Out Cords |
|
|
| ||||
care that the collar truly |
|
|
| ||||
NOTE: Do not drop carry bag. Do not bounce the bag on its end to get |
|
|
| ||||
captures the button, |
|
|
| ||||
the frame out. These actions may damage the electrical components. | otherwise the roof will |
|
|
| |||
Although it is possible to raise this structure by yourself; it is much easier | slide back down. |
| g.4 | ||||
and faster if you have help. |
|
| • Continue with the rest of |
| |||
|
|
|
|
| |||
Expand the Frame: |
|
| the perimeter rafters |
|
|
| |
|
| until all corners are |
|
|
| ||
|
|
|
|
| |||
• Open the carry bag, remove the frame and top. Lay the top aside and | locked in place and the |
|
| ||||
stand the frame up, near its final location | roof is extended as |
|
| ||||
• With one person at A and another at B, lift the poles and step back to | shown in g. 6 |
|
| ||||
pull the legs out and away from the center. See fig. 1. Move to C and D |
|
|
|
| |||
and again lift and pull the | B | D | A |
|
| ||
legs out and away. Work |
|
| |||||
back and forth between |
| C |
|
|
|
| |
AB and CD, until the |
|
|
|
|
|
| |
frame is extended as |
|
|
|
|
|
| |
shown in g. 2 |
|
|
|
|
|
| |
• If you are working alone, |
|
|
|
|
|
| |
pull the frame apart as |
|
|
|
|
|
| |
best you can and then |
|
|
|
|
|
| |
drive a nailhead stake |
|
|
|
|
|
| |
through the hole in the |
|
|
|
|
|
| |
baseplate of one of the |
|
| Attach the Canopy Top to the Frame: | ||||
legs. See g. 3. Work your |
|
| |||||
way from corner, pulling |
|
| • Lay the fabric on the ground with the top facing | ||||
out and away from the |
|
| up and square to the frame. |
|
| ||
staked leg |
|
| • Grasp the two canopy corners closest to the frame | ||||
• Continue until the frame |
| g.1 | and drag them up and over the roof to the frame | ||||
is extended as shown in |
| corners on the opposite side. Take care that the | |||||
g. 2 |
|
| electrical plugs do not get caught on the frame as |
you tug the canopy
• At each corner, fit the fabric snug to the frame. Align the guy gusset to the top of the frame and at a 45˚ angle from the leg. See fig. 7
• Move inside, under the canopy. Wrap each pair of Velcro® hook pads from the inside corners of the
g.5
g.6
g.7
Raise the Legs:
•Station one person at each leg on one side of the frame.
Lift the legs and
press the button on the black collar to release the inside section. See g. 10. Allow the inside
sections to fall to one of the three lock points. Make sure that the legs are the
same height and that they are locked ing.10 place. See g.11
• Repeat with the remaining two legs
Secure the Structure to the Ground:
•Drive a nailhead stake through the holes in the baseplates at the bottom of the legs. See fig. 12
•Use the skewers to stake
the guyout cords and adjust tension with the attached sliders. See g. 13
g.12 | g.13 |
YOUR CANOPY IS READY!
E! Power System: To use, you will need a power source. Our E! Power Pak™ is sold separately. Once connected to power, the control will display “green” at any switch that is “ON” and the “ON” socket will glow blue. See g 14
canopy to the loops near the top of the corner poles. See g. 8
• Attach all remaining Velcro® tabs to the perimeter and roof rafters. See fig. 9
g.2
g.3 | g.9 |
g.8
Take Down: Pull up all stakes. Release the canopy’s hook & loop straps and remove from the frame. You may leave the wire harness in place. Collapse all poles and stow. Fold the canopy onto itself, roll up.and stow.
Read the important safety instructions on the reverse side.
blue
green
g.14
Rev B 4.09