Cabling SMA Solar Technology AG
18 PBL-SMC-NR-IXX082210 Installation Guide
1. Twist off the cover of the threaded joint on the bot-
tom side of the Sunny Mini Central (if present).
2. Plug the SMA Power Balancer cable on the socket.
The markers (1 to 3) must form a line, as illustrated
on the right.
3. Tighten the cable screw connection with a half
turn.
The cable is firmly connected.
You can now activate the SMA Power Balancer via a
communication device.