Installation and Operation Guide
HFC-10 Deliming System for Ware Washing Equipment
Provides simple, efficient deliming of commercial ware washing equipment, utilizing ScaleKleen™, Everpure’s proprietary scale remover.
BENEFITS
•Permanently plumbed in the hot water feed line before booster heater and dishwasher.
•Drastically reduces maintenance teardowns due to limescale accumulation.
•Assures high efficiency of heating elements by removing limescale deposits.
•Utilizes Everpure’s proprietary foodgrade delimer ScaleKleen™ — no offensive odors, no burned skin or clothing, environmentally safe.
•High grade
•Extends life of equipment.
APPLICATIONS
•Flash steamers
•Conventional steamers
•
•Coffee/espresso machines
System Part No.
DEMLIMING SCHEDULE
Dishwasher Operation (Hours)
Water Hardness | |||
Soft, | 30 days | 24 days | 18 days |
Moderately Hard, | 24 days | 18 days | 12 days |
Very Hard, > 15 gpg | 9 days | 6 days | 3 days |
|
|
|
|
To determine water hardness and frequency of deliming, follow instructions on hardness test strip package and compare to hours of operation.
Includes:
(1)2.2 lb. Scalekleen package
(1)Diptube assembly
(1)Hardness Test Strip
FLOW
SPECIFICATIONS
Dimensions: 121⁄2"L x 51⁄2"W x 51⁄2"D
(allow extra 4" underneath for shell removal) Inlet connection: 1/2" MPT
Pressure (Minimum - Maximum): 10 - 125 psi
Maximum temperature: 160°F
Shipping weight: 5 lbs.
Operating weight: 7 lbs.
INSTALLATION
Note: System must be installed on inlet water line to equipment. Everpurerecommends the installation of a
1.Turn off power to equipment and drain water from system, if necessary.
2.Provide appropriate tee connections for inlet and outlet connections. Refer to the diagram at right.
3.Install a bypass valve (buyer provided) between the inlet and outlet connections. Refer to the diagram at right.
4.Install ball valves to inlet and outlet connections on the
5.Make appropriate connections to ball valves.
1 |
2 |
3 |
4 |
BALL VALVE | BYPASS VALVE |
SPARE PARTS:
1.
2.
3.
4.
Printed in U.S.A. |