IPL 250 • Hardware Features and Installation
2-2
Hardware Features and Installation
Setup Checklist: How to Proceed With Installation
Get Ready
Familiarize yourself with the IPL 250's features.
Download and install the latest version of the Extron Global Configurator software
(version 3.0 or higher) and the latest driver package (available from www.extron.com
or the Extron Software Products Disk.)
Obtain IP setting information from the network administrator for the IPL.
Obtain model names and setup information for devices that the IPL will control.
Perform Physical Installation
Mount the unit to a rack, furniture, or projector mount. (See the instructions in this chapter.)
Cable devices to ports on the IPL 250. (See chapter 2 of this manual or of the IPL 250
Setup Guide.)
Connect power cords and turn on the devices in the following order: output devices
(projectors, monitors, speakers), the IPL, a PC (for setup) or touchpanel (for control
after configuration), then all input devices (DSS, cable boxes, etc.).
Congure the IPL
Connect the PC to the IPL 250 via Ethernet patch or crossover cable (see
chapter 2) and use Telnet or a similar application to configure the IPL for network
communication.
Connect any TLP touchpanels that will be part of the system to the same network as
the PC and IPL. Create a user interface layout for the touchpanels and upload the
GUI configuration to each touchpanel. (See the GUI Configurator software help file
for details.)
Configure the IPL 250 using Global Configurator. (Refer to the Global Configurator
Help file.)
Create a new Global Configurator project.
Set the IPL’s IP address, subnet mask, and other IP settings.
Define the unit’s GlobalViewer Tree location.
Add the IPL to the project.
Define e-mail settings and contacts.
Add serial, IR, and Ethernet device drivers.
Configure the IPL’s ports and assign device drivers as needed.
Configure touchpanel buttons, if applicable, in GC.
Create a display shutdown schedule.
Create a display lamp hours notification e-mail.
Create a display disconnection notification e-mail.
Perform configurations for special applications, if needed.
Save the Global Configurator project/configuration.
Build and upload the configuration.
Test the system.