Extron electronic AAP 102 FSR, VGA M12, VGA M3 Installation, cont’d, Installation Instructions

Models: AAP 102 FSR Series AAP 102 FSR RGB 472xi FSR Series RGB 460xi FSR Series VGA M6 VGA M3 VGA M12

1 7
Download 7 pages 6.57 Kb
Page 5
Image 5
Installation, cont’d

Installation, cont’d

8The picture should now appear, and sound should be audible. If not, ensure that all devices are plugged in and receiving power. Check the cabling and switch settings, and make adjustments as needed.

9Disconnect power from all the devices.

10Mount the interface or adapter plate into the floor box. See Mounting the interface or adapter plate to the floor box in this manual.

11Restore power to the devices.

Installation Instructions

CAUTION

The interface must be installed into an

 

Underwriters Laboratories (UL) approved FSR

 

electrical floor box. The floor box is not included

 

with the interface; the installer is responsible for

 

obtaining and installing the box.

Preparing the site and cables

Choose a location that allows cable runs without interference. Allow enough depth for both the floor box and the cables. You need to run the conduit (if required by local code) and cables under the floor before installing the interface.

The installation must conform to national and local electrical codes and to the interface’s size requirements.

1.

Install the floor box in accordance with the documentation

 

that accompanied the box.

2.

Feed cables through the floor box punch-out holes, and

 

secure them with cable clamps to provide strain relief.

3.

Exposed cable shields (braids or foil) are potential sources

 

of short circuits. Trim back and/or insulate shields with

 

heat shrink, or ground the shield to the box (figure 1).

 

 

To prevent short circuits, the outer foil shield can be

 

CAUTION

 

 

cut back to the point where the cable exits the cable

 

 

clamp. Both braided and foil shields should be

 

 

connected to an equipment ground at the other end

 

 

of the cable.

4.

Set the gain and DIP switches and cable and test the device

 

before securing it into the floor box. The switches and

 

cables will be inaccessible after installation.

Refer to the RGB 400xi Series User Manual, Part #68-542-01 or the RGB 470xi Series User Manual, Part #68-661-01 for additional information.

Plastic Filler Strip (optional)

 

IFT

 

H.SH

OR

 

NIT

 

MO

AX

 

MIN/M

 

 

T

 

 

 

INPU

 

 

NITOR

 

 

NO

MO

DIO

 

R

AU

FSR

 

NITO

 

 

MO

 

460xi

 

 

 

RGB

RGB 460xi FSR

Mounting Plate

Installation

Cable

FSR Box Installation Instructions

Screw

Braided Shield

Figure 1 — Securing the RGB 460xi FSR adapter plate to the floor box and grounding the braided shield

5. Secure the interface or adapter plate to the floor box with

the screws provided. See Mounting the interface or adapter plate below.

Mounting the interface or adapter plate to the floor box

1.Disconnect the power supply to remove power from the interface.

2.

If installed, remove the floor box’s top panel and trim frame.

2

RGB 460xi/472xi/AAP 102 FSR Series • Installation Guide

RGB 460xi/472xi/AAP 102 FSR Series • Installation Guide

3

Page 5
Image 5
Extron electronic AAP 102 FSR, VGA M12 manual Installation, cont’d, Installation Instructions, Preparing the site and cables