6.Install the bearing (B, Figure 26) on the shaft with the grease fitting pointing towards the discharge of the blower. Secure with the four 7/16 x
(A) and
7.Install the 5/16” x
8.Install the spring (G) on the 5/16” bolt (D) on the blower mount and install the 5/16” nylon lock nut (F). Only tighten the nuts until the threads come through the nylon. Do not clamp spring.
9.Install the deck support rail (A, Figure 27) and fasten with the
10.Install the spring (C) on the idler arm and secure with the 5/16” nylon lock nut (D). Only tighten the nut until the threads come through the nylon. Do not clamp spring.
61” Blower Mount & Drive Installation
| A |
| B |
|
|
| D |
|
|
| E |
|
|
| C |
|
|
| F |
|
| G |
|
Figure 26. Install Bearing & Spring | |||
A. | E. | ||
B. | Bearing |
| F. |
C. | G. Spring | ||
D. |
| ||
|
| B |
|
| B |
|
|
D |
|
|
|
|
|
| D |
|
|
| D |
| C |
| A |
| D | B |
|
|
|
|
Figure 27. Install Support Rail & Spring
A. | Deck Support Rail | C. | Spring |
B. | D. |
13