Fisher & Paykel RB905, RB365 dimensions Final Checklist, Date of installation, Operation

Models: RB365 RB905

1 8
Download 8 pages 6.79 Kb
Page 8
Image 8
18FINAL CHECKLIST

18FINAL CHECKLIST

TO BE COMPLETED BY THE INSTALLER

Has all packaging been removed from the appliance?

Is the appliance securely fastened to the cabinetry?

Does the drawer slide freely and close properly?

Has the outlet duct been installed correctly?

Is the appliance level?

Are the panels securely attached?

Have the panels been properly aligned for correct operation and appearance? Are all clearances even?

Is there clearance between drawer and cabinetry frame?

Has the power cord been plugged into a properly grounded 3-prong outlet, which has been installed in accordance with all applicable electrical codes?

OPERATION:

Is the control panel lit?

Can you hear the compressor motor running?

When a hand is placed near the toe kick, can airflow be felt under front right-hand side of appliance?

Have you demonstrated the basic operation to the customer?

Installer’s name:

Installer’s signature:

Installation company:

Date of installation:

LEAVE THESE INSTRUCTIONS WITH THE CUSTOMER

www.fisherpaykel.com 840509B FRAMED CABINETRY 08.08

Page 8
Image 8
Fisher & Paykel RB905 Final Checklist, Installer’s name Installer’s signature Installation company, Date of installation