Five Star Ranges PN047-7, TN047-7 Step Checklist For Sealed Burner Installation

Models: TN047-7 PN047-7

1 8
Download 8 pages 5.57 Kb
Page 8
Image 8

STEP 7

CHECKLIST FOR SEALED BURNER INSTALLATION

MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION.

Gas supply is “on”

Electric power is “on”

Check for proper seating of burner caps into burner base.

Burner grates in position

Surface burner ignition test

Griddle/Grill burner ignition test

Griddle/Grill assembly in position

MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION

Date Installed & Inspected __________________________________________________

Authorized Installer’s Signature _____________________________________________

Please Print Name ________________________________________________________

NOTE: Please leave this checklist, Use & Care manual and product registration card with the Homeowner.

Page 8
Image 8
Five Star Ranges PN047-7 Step Checklist For Sealed Burner Installation, Make Sure All Controls Are In The “Off” Position