Note: Do not elevate the overflow line higher than

3 inches (7.6 cm) below the bottom of the overflow fitting. Do not tie into the drain line of the control unit. The overflow line must be a direct, separate line from the overflow fitting to the drain, sewer, or tub. Allow an air gap as in the drain line connection, Figure 10.

WARNING: Never insert drain line directly into a drain, sewer line, or trap (Figure 11). Always

allow an air gap between the drain line and the waste water to prevent the possibility of sewage being back-siphoned into the conditioner. Secure

the end of the drain line to prevent it from moving (Figure 11).

Air Gap

Drain

Figure 11

Brine Tank

Normally one brine tank is needed for each tank. The use of block salt or rock salt is not recommended. If a brine shelf is used, two brine tanks are required. This is due to the increased time needed to produce a concentrated brine solution when using a salt shelf. If rapid multiple exhaustions and regenerations are anticipated, do not use a salt shelf even if two brine tanks are used.

Electrical Connection

Caution: This valve and control are for dry location use only unless used with a Listed Class 2 power supply suitable for outdoor use.

The 764 Series control operates on a 12-volt alternating current power supply. This requires use of the GE Water Technologies supplied AC adapter. A variety of AC adapters are available from your supplier for different applications. They include:

AC Adapter

Input

Application

Part

Voltage

Number

 

 

 

 

 

 

Standard

120V 60

UL listed for

 

indoor

1000811

wall-mount

Hz

installations

 

 

 

 

 

 

 

 

Outdoor

120V 60

UL listed for

 

outdoor

1235448

rated

Hz

installations

 

 

 

 

 

 

 

 

120 VAC AC Adapters:

Make sure power source matches the rating printed on the AC adapter.

Note: The power source should be constant. Be certain the AC adapter is not on a switched outlet. Power interruptions longer than 8 hours may cause the controller to lose the time and day settings. When power is restored, the control will display four dashes (- - :- -) indicating that the day and time settings must be re- entered

Note: Do not connect power by plugging in the transformer at this time. Doing so may cause difficulty in properly placing the unit into operation.

Caution: Plumbing cannot be used for electrical grounding when metal inlet and outlet piping is connected to a non-metal valve.

Connect the inlet and outlet piping together using a grounding strap or clamp to establish continuity.

10

Page 10
Image 10
GE 255 operation manual Electrical Connection, Brine Tank, VAC AC Adapters

255 specifications

The GE 255 is a versatile and powerful gas turbine, known for its exceptional efficiency and reliability in various industrial applications. As one of the flagship models from General Electric, the GE 255 has garnered attention for its performance, design, and technological advancements.

One of the main features of the GE 255 is its advanced aerodynamics. The turbine incorporates cutting-edge blade designs that enhance airflow and optimize combustion efficiency. These aerodynamic improvements contribute to increased power output, allowing the turbine to generate more energy while consuming less fuel. The efficiency of the GE 255 makes it an attractive option for power plants looking to reduce operational costs while maintaining high output levels.

In addition to its aerodynamic features, the GE 255 is equipped with sophisticated combustion technology. This technology enables the turbine to achieve low emissions, adhering to strict environmental regulations. The combustion system is designed to provide stable and reliable operation across various load conditions, ensuring that power generation remains consistent even in fluctuating demand scenarios.

The GE 255 also boasts a modular design, allowing for easier maintenance and upgrades. The components are designed with serviceability in mind, ensuring that downtime is minimized during routine inspections or repairs. This modular approach not only enhances the overall lifespan of the turbine but also allows operators to implement technology upgrades as they become available, ensuring that the equipment remains state-of-the-art.

Moreover, the GE 255 integrates advanced monitoring and control systems that provide real-time data on performance and operational health. These systems enable operators to make informed decisions, optimizing performance and identifying potential issues before they escalate. The data collected can be analyzed to improve operational practices and reduce maintenance costs.

The turbine's robust construction also contributes to its reliability. Built to withstand harsh operating conditions, the GE 255 includes features that protect critical components from wear and degradation. This durability extends the operational life of the turbine and enhances its overall availability for power generation.

In summary, the GE 255 is a state-of-the-art gas turbine distinguished by its advanced aerodynamics, low emissions combustion technology, modular design, and robust monitoring systems. It represents a blend of efficiency and reliability, making it a leading choice for energy providers aiming to maximize output while minimizing environmental impact. Its combination of innovative features positions the GE 255 as a significant player in the competitive landscape of gas turbines.