Unit in Service

Y

B

Y

B

 

 

P

 

P

 

A

A

S

S

S

S

Unit in Bypass

SSAPY

 

SAP

Y

B

B

S

 

 

 

Figure 7

Installation

All plumbing must conform to local codes. The two tanks should be plumbed to an interconnecting manifold, Figure 6. It is highly recommended that separate brine lines be used for each tank. It is critical for the resin, resin volume, inlet piping, etc. to be identical for both tanks.

WARNING: Do not use tools to tighten plastic fittings. Over time, stress may break the connections. Hand tighten the nuts.

WARNING: Do not use petroleum grease on gaskets when connecting bypass plumbing. Use only 100% silicone grease products when installing any Autotrol brand valve. Non-silicone grease may cause plastic components to fail over time.

WARNING: The inlet water must be connected to the inlet port of the valve. When replacing non- Autotrol valves, the inlet and outlet may be reversed. Ensure that the plumbing is not installed in the oppposite order. Tank media may be pushed into the valve.

WARNING: Filter media may need to be properly conditioned before the filter is placed into full operation. Consult the original equipment manufacturer for proper procedure.

Location Selection

The following considerations must be taken into account when selecting the location for the water conditioning system.

Locate the system as close to a drain as possible.

If supplementary water treating equipment is required, make sure that adequate additional space is available. Locate the brine tank in an accessible place so that salt can be easily added.

Do not install any system with less than 10 feet

(3 m) of piping between the outlet of the conditioners and the inlet of the water heater. Water heaters can transfer heat down the cold water pipe into the control valve. Hot water can severely damage the conditioners.

Aten-foot (3-m) total pipe run (including bends, elbows, etc.) is a reasonable distance to prevent hot water damage. A positive way to prevent hot water from flowing from a heat source to the conditioners is to install an expandable accumulator tank before the hot water heater. Always conform to local codes.

Do not locate the unit in an area where the ambient temperature is ever below 34oF (1oC) or over 120oF (49oC).

Maximum allowable water temperature is 100oF (38oC).

Do not install the unit near acid or acid fumes.

Do not expose the unit to petroleum products.

Water Line Connection

A bypass valve system must be installed to accommodate occasions when the water conditioning system must be bypassed for supplying hard water or servicing. See Figures 7 and 8.

Not in Bypass

In Bypass

Conditioning

Conditioning

System

System

 

W t

 

Figure 8

8

Page 8
Image 8
GE 255 operation manual Installation, Location Selection, Water Line Connection

255 specifications

The GE 255 is a versatile and powerful gas turbine, known for its exceptional efficiency and reliability in various industrial applications. As one of the flagship models from General Electric, the GE 255 has garnered attention for its performance, design, and technological advancements.

One of the main features of the GE 255 is its advanced aerodynamics. The turbine incorporates cutting-edge blade designs that enhance airflow and optimize combustion efficiency. These aerodynamic improvements contribute to increased power output, allowing the turbine to generate more energy while consuming less fuel. The efficiency of the GE 255 makes it an attractive option for power plants looking to reduce operational costs while maintaining high output levels.

In addition to its aerodynamic features, the GE 255 is equipped with sophisticated combustion technology. This technology enables the turbine to achieve low emissions, adhering to strict environmental regulations. The combustion system is designed to provide stable and reliable operation across various load conditions, ensuring that power generation remains consistent even in fluctuating demand scenarios.

The GE 255 also boasts a modular design, allowing for easier maintenance and upgrades. The components are designed with serviceability in mind, ensuring that downtime is minimized during routine inspections or repairs. This modular approach not only enhances the overall lifespan of the turbine but also allows operators to implement technology upgrades as they become available, ensuring that the equipment remains state-of-the-art.

Moreover, the GE 255 integrates advanced monitoring and control systems that provide real-time data on performance and operational health. These systems enable operators to make informed decisions, optimizing performance and identifying potential issues before they escalate. The data collected can be analyzed to improve operational practices and reduce maintenance costs.

The turbine's robust construction also contributes to its reliability. Built to withstand harsh operating conditions, the GE 255 includes features that protect critical components from wear and degradation. This durability extends the operational life of the turbine and enhances its overall availability for power generation.

In summary, the GE 255 is a state-of-the-art gas turbine distinguished by its advanced aerodynamics, low emissions combustion technology, modular design, and robust monitoring systems. It represents a blend of efficiency and reliability, making it a leading choice for energy providers aiming to maximize output while minimizing environmental impact. Its combination of innovative features positions the GE 255 as a significant player in the competitive landscape of gas turbines.