17

TOOLS AND MATERIALS

YOU WILL NEED

Saw
Duct tape
Measuring tape or scale
Carpenter’s square
Adjustable wrench or socket set (7/16socket and
ratchet)
Drill and drill bit
1/4nut driver
Sheet metal screws
Pipe wrench
Manual gas line shut-off valve
Pipe joint sealant that resists action of LP gas
Ductwork to suit the installation
For rigid connection:
Shut-off valve
Union
Pipe fittings as required
For flexible connection where local codes permit:
Flexible metal tubing (same 3/4or 1/2I.D. as gas
supply line)
2178
2012
22
2978
214
2834

30COOKTOP (DIMENSIONS FOR REFERENCE ONLY)

Unit shown fully assembled.
Unit must be vented to the outside!
Installation Instructions
PREPARATION