Installation Instructions

Air Conditioner

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT Save these

instructions for local inspector’s use.

IMPORTANT Observe all governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions for future reference.

Skill level – Installation of this appliance requires basic mechanical skills.

Completion time – Approximately 1 hour

We recommend that two people install this product.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

You MUST use all supplied parts and use proper installation procedures as described in these instructions when installing this air conditioner.

ELECTRICAL REQUIREMENTS

Some models require a 115/120-volt a.c., 60 Hz grounded outlet protected with a

15-amp time delay fuse or circuit breaker.

The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

Some models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

9

CAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

TOOLS YOU WILL NEED

Phillips head screwdriver

Pencil

 

Ruler or tape measure

 

 

 

Level

 

Scissors or knife

 

 

 

Power cord includes a current interrupter device. A test and reset button is provided on the plug case. The device should be tested on a periodic basis by first pressing the TEST button and then the RESET button while plugged into the outlet. If the TEST button does not trip or if the RESET button will not stay engaged, discontinue use of the air conditioner and contact a qualified service technician.

Page 9
Image 9
GE ASM06* installation instructions Before YOU Begin, Electrical Requirements, Tools YOU will Need

ASM06* specifications

The GE ASM06* is a sophisticated gas turbine engine designed and manufactured by General Electric, specifically tailored for aviation applications. This powerful engine is a result of advanced engineering and innovative technologies aimed at delivering superior performance, efficiency, and reliability.

One of the main features of the ASM06* is its robust design, which integrates state-of-the-art materials and manufacturing processes. Utilizing advanced composite materials in fan blades and complex cooling systems, the engine achieves a remarkable balance between weight and performance, which is crucial for maximizing fuel efficiency and minimizing operational costs.

The ASM06* incorporates a high bypass ratio, which enhances its thrust capabilities while reducing noise emissions. This is especially beneficial for commercial aviation, as it meets stringent environmental regulations while providing a comfortable flying experience. The fan configuration also plays a significant role in optimizing aerodynamic performance, leading to better fuel consumption compared to older models.

Another standout characteristic of the ASM06* is its advanced digital engine control system. This system allows for real-time monitoring and precise adjustments to engine parameters, ensuring optimal performance under various flying conditions. The use of innovative sensors and control algorithms provides significant reliability and enhances maintenance capabilities, enabling operators to monitor engine health and performance efficiently.

In terms of technology, the ASM06* features high-efficiency combustors designed to minimize nitrogen oxide (NOx) emissions. These advanced combustor technologies help the engine to operate with lower environmental impact while maintaining high power output. The use of additive manufacturing techniques has also been a game-changer in producing complex components that were previously difficult to fabricate, resulting in a reduction of weight and an increase in durability.

The modular design of the ASM06* facilitates easier maintenance and quicker turnaround times, which is vital for airlines looking to maximize aircraft availability. This capability not only reduces operational expenses but also enhances overall fleet performance.

In conclusion, the GE ASM06* represents a significant advancement in gas turbine technology, combining high performance, fuel efficiency, and lower emissions. Its innovative features and characteristics make it an attractive choice for airlines looking to improve their operational effectiveness while adhering to environmental standards. With its advanced design and technologies, the ASM06* will undoubtedly play a critical role in the future of aviation engines.