Stacking.

KIT CONTENTS (optional kit GE FL STACK)

Right Hand Bracket

4 Rubber Pads

4 #12 x 1” Screws

 

 

 

Left Hand Bracket

4 #8 x 1/2” Screws

TOOLS YOU WILL NEED

Phillips Screwdriver

Pliers

Gloves

 

 

 

Open-Ended Wrench

 

Level

INSTALLATION PREPARATION

Remove the packaging..

Flatten the product carton to use as a pad

to lay the dryer down on its side.. Continue using the carton to protect the finished floor in front of the installation location..

20

Page 20
Image 20
GE GFDN245, GFDS350, GFDN240, GFDS355, 234D1050P001 KIT Contents optional kit GE FL Stack, Installation Preparation