GE JGP337 Preparing The Opening, Overall cooktop dimensions, Cutout dimensions, of the countertop

Models: JGP337

1 68
Download 68 pages 54.57 Kb
Page 18
Image 18
PREPARING THE OPENING

Installation Instructions

A

PREPARING THE OPENING

A1

The following MINIMUM clearance

 

dimensions must be maintained.

 

13" MAX. Depth

 

of unprotected

 

overhead cabinets

 

 

6" MIN.

 

clearance from

 

cutout to side

 

wall on the right

 

of the unit

30" MIN.

 

clearance from

18" MIN.

countertop to

height from

unprotected

countertop to

overhead surface

nearest cabinet on

 

either side of unit

3 3/4" MIN.

 

clearance from

 

cutout to side

 

wall on the left

 

of the unit

 

A2

Overall cooktop dimensions

 

30"

21"

 

 

 

 

 

 

COOKTOP

3"

 

19 1/2"

28 3/8"

 

A3

Cutout dimensions

 

of the countertop

 

To insure accuracy, it is best to make a template when cutting the opening in the counter.

A4 The recommended Gas Supply Location from the backwall.

1" Min. From Backwall

Recommended

gas supply13 1/4" location.

Overall cooktop dimensions19 1/2" From Cutout

Center Line

Make sure the wall coverings,

A5 countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by cooktop.

Wall covering, cabinets and countertop must withstand heat up to 200°F.
19 5/8" width of cut

 

28 1/2"
14 1/4"
2 1/4" Min.
length of

 

cut

 

Between cutout

 

 

 

and the wall behind

 

 

the cooktop

 

 

2 1/2" Min. from front edge of cutout

and front edge of countertop

18

Page 18
Image 18
GE JGP337 Preparing The Opening, Overall cooktop dimensions, Cutout dimensions, of the countertop, 19 5/8 width of cut