Instructions

Window Installation Instructions.

Tips Installation Instructions Operating Instructions Safety

3

4

Remove the Air Conditioner From the Case

ARemove the 2 shipping screws from the back of the case.

BRemove the 2 screws on each side of the case. Keep these for later use.

Shipping screws

Prepare the Window and the Case

ACut the window sash seal to the proper length. Peel off the backing and attach the seal to the underside of the window sash.

CSlide the air conditioner from the case by gripping the base pan handle and pulling forward while bracing the case.

CRemove the backing from the top mounting rail seal strip and attach the seal to the bottom of the top mounting rail.

Troubleshooting

BCarefully insert the plastic frame guides into the bottom of the case on each side.

Bottom of case

D

Install the top mounting rail with 3 type A screws on the inside of the case. Insert the frames for the accordion panels into the top mounting rail and the frame guides. Attach the accordion panels to the side of the case using 5 type A screws.

Top mounting rail

Consumer Support

Frame guide

12

Frame guides

12

Page 12
Image 12
GE MG_24, AG_14 installation instructions Prepare the Window and the Case, Remove the Air Conditioner From the Case

AG_14, MG_24 specifications

The GE AG_14 and MG_24 are two advanced electric power generation systems developed by General Electric (GE) that showcase the innovative approaches the company is known for in the energy sector. These systems are engineered to meet the demands of modern energy requirements, leveraging cutting-edge technologies and features to enhance performance and efficiency.

The GE AG_14 is a gas turbine power generation system designed for high efficiency and low emissions. It is built to operate on a wide range of fuels, including natural gas and biofuels, making it versatile for various energy applications. One of the standout features of the AG_14 is its advanced combustion technology, which minimizes nitrogen oxide (NOx) emissions while optimizing fuel consumption. Additionally, the AG_14 incorporates advanced materials and design principles to improve durability and maintenance intervals, reducing overall lifecycle costs.

The system is equipped with integrated digital controls that allow for real-time monitoring and precise management of operations. This helps optimize performance and improve reliability, ensuring that the energy output is consistent and meets grid requirements. The modular design of the AG_14 allows for easy transportation and installation, making it suitable for both temporary and permanent setups.

On the other hand, the GE MG_24 is a multi-generational distributed power solution aimed at providing reliable energy in remote or off-grid locations. Its hybrid capability enables it to function alongside renewable energy sources like solar and wind, effectively contributing to a greener energy mix. The MG_24 features energy storage integration, allowing for smooth operation during periods of fluctuating energy demand and supply.

The MG_24 system is designed with robust telemetry and internet of things (IoT) capabilities, enabling operators to manage the unit efficiently from a distance through a centralized control platform. This enhances operational visibility and aids in predictive maintenance, which helps minimize downtime.

Characteristics of both the AG_14 and MG_24 systems highlight GE's commitment to sustainability, efficiency, and adaptability in today's energy landscape. With these innovative solutions, GE continues to play a pivotal role in shaping the future of power generation, addressing the challenges of energy transition while promoting economic growth and environmental stewardship.