Operating Instructions Safety Instructions

Window Installation Instructions.

Install the Window Locking Bracket and the Foam Top Window Gasket

7

 

Attach the window locking bracket with a

 

Cut the foam top window gasket to the window

A

B

type C screw.

width.

 

 

 

 

 

 

Stuff the foam between the glass and the

 

 

 

C

 

 

 

 

window to prevent air and insects from getting

 

 

 

 

 

 

 

 

into the room.

Troubleshooting Tips Installation Instructions

Install the Air Conditioner in the Case

8

 

Slide the air conditioner into the case.

A

Reinstall the 2 screws removed earlier on each

 

 

 

side of the case.

 

 

Before installing the front grille, pull out the

 

B

 

 

vent control lever located above the unit

 

 

 

 

control knobs, as shown.

C

Attach the front grille to the case by inserting the tabs on the grille into the slots on the front of the case. Push the grille in until it snaps into place.

Consumer Support

 

Guide the lever carefully

 

through the grille as you

 

push it in.

D

Lift the inlet grille and secure the front frame

 

with a type A screw. Lower the inlet grille into

 

place.

14

Page 14
Image 14
GE MG_24, AG_14 installation instructions Install the Air Conditioner in the Case

AG_14, MG_24 specifications

The GE AG_14 and MG_24 are two advanced electric power generation systems developed by General Electric (GE) that showcase the innovative approaches the company is known for in the energy sector. These systems are engineered to meet the demands of modern energy requirements, leveraging cutting-edge technologies and features to enhance performance and efficiency.

The GE AG_14 is a gas turbine power generation system designed for high efficiency and low emissions. It is built to operate on a wide range of fuels, including natural gas and biofuels, making it versatile for various energy applications. One of the standout features of the AG_14 is its advanced combustion technology, which minimizes nitrogen oxide (NOx) emissions while optimizing fuel consumption. Additionally, the AG_14 incorporates advanced materials and design principles to improve durability and maintenance intervals, reducing overall lifecycle costs.

The system is equipped with integrated digital controls that allow for real-time monitoring and precise management of operations. This helps optimize performance and improve reliability, ensuring that the energy output is consistent and meets grid requirements. The modular design of the AG_14 allows for easy transportation and installation, making it suitable for both temporary and permanent setups.

On the other hand, the GE MG_24 is a multi-generational distributed power solution aimed at providing reliable energy in remote or off-grid locations. Its hybrid capability enables it to function alongside renewable energy sources like solar and wind, effectively contributing to a greener energy mix. The MG_24 features energy storage integration, allowing for smooth operation during periods of fluctuating energy demand and supply.

The MG_24 system is designed with robust telemetry and internet of things (IoT) capabilities, enabling operators to manage the unit efficiently from a distance through a centralized control platform. This enhances operational visibility and aids in predictive maintenance, which helps minimize downtime.

Characteristics of both the AG_14 and MG_24 systems highlight GE's commitment to sustainability, efficiency, and adaptability in today's energy landscape. With these innovative solutions, GE continues to play a pivotal role in shaping the future of power generation, addressing the challenges of energy transition while promoting economic growth and environmental stewardship.