Standby Generator Sets

Service Schedule

SERVICE SCHEDULE

30 KW - 150 KW STANDBY GAS ENGINE DRIVEN GENERATOR SETS

The following is a recommended maintenance schedule for standby gas engine driven generator sets from 30kW to 150 kW in size. The established intervals in the schedule are the maximum recommended when the unit is used in an average service application. They will need to be decreased (performed more frequently) if the unit is used in a severe application. Use calendar time, from the previous maintenance interval to determine the next required maintenance interval.

Service Maintenance Interval Information:

The various service maintenance intervals are designated by interval numbers as follows:

1An early inspection of the generator set to insure it is ready to operate when required and to identify any poten- tial problem areas.

This inspection may be performed by the end user providing the following safety steps are taken to prevent the engine from starting automatically without warning:

To prevent injury, perform the following steps in the order indicated before starting any maintenance:

Disable the generator set from starting and/or connecting to the load by setting the control panel Auto/Off/ Manual switch to the “OFF” position.

Remove the 15 amp control panel fuse.

Turn off the battery charger.

Remove the negative battery cable.

The battery charger must be turned off BEFORE removing the battery cable to prevent an over current condition

from burning out sensitive control panel components and circuits.

Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal operation when required.

2A wear-in service inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any potential problem areas.

Performed ONLY ONCE following the first three months or the first 30 hours of operation after purchase of the unit.

This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an Authorized Service Dealer.

3An operational inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any potential problem areas.

Performed semi-annually or following each 50 hours of operation of the unit.

This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an Authorized Service Dealer.

4A mid-level inspection of the generator set to insure it is ready to operate and carry the load when required, and to identify any potential problem areas.

Performed annually or following each 100 hours of operation of the unit.

This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an Authorized Service Dealer.

5A comprehensive inspection of the generator set to insure it is properly serviced and ready to operate and carry the load when required, and to identify any potential problem areas.

Performed annually or following each 250 hours of operation of the unit.

This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge to accomplish and should be performed only by an Authorized Service Dealer.

11-1

09/05 A .Rev SrvSchd001

Page 20
Image 20
Generac Power Systems 005262-1 owner manual Service Schedule, KW 150 KW Standby GAS Engine Driven Generator Sets

005262-1 specifications

Generac Power Systems 005262-1 is a highly regarded portable generator known for its reliable performance and advanced technologies. Designed to meet a variety of power needs, this generator is ideal for both residential and commercial applications, especially during power outages or outdoor events where electricity access is limited.

One of the key features of the Generac 005262-1 is its powerful 7,500 running watts and 9,375 starting watts, making it capable of powering essential appliances, tools, and equipment during times of need. This robust wattage ensures that users can operate multiple devices simultaneously without worry.

Equipped with a Generac OHV engine, the generator boasts a durable and efficient design that enhances performance while maximizing fuel efficiency. It operates on gasoline, offering approximately 11 hours of run time at half load, which is particularly valuable for extended outages or prolonged usage scenarios. The engine is designed to shut off automatically when low oil levels are detected, protecting it from potential damage and ensuring longevity.

The 005262-1 features a steel frame with foldable handles and wheels, promoting portability and ease of transport. This thoughtful design allows users to easily move the generator to wherever it is needed, making it perfect for outdoor events, job sites, or emergency situations. The generator also comes with a 10-inch wheel kit, enhancing mobility over different terrains.

Additionally, Generac offers PowerRush technology in the 005262-1 model. This innovative feature provides users with a substantial increase in starting capacity, enabling the generator to handle heavy loads more effectively, especially when first powering up equipment.

Safety and convenience are also prioritized with various outlets, including a 120V 30A twist-lock outlet and multiple 120V 20A household outlets, allowing for diverse connectivity options tailored to specific power needs.

In summary, the Generac Power Systems 005262-1 stands out due to its powerful output, advanced engine technology, portable design, and user-friendly features. Whether needed for home backup power, recreational activities, or on-site job use, this generator remains a trusted choice for dependable electricity supply. Its combination of performance, efficiency, and safety makes it a worthy investment for anyone seeking a reliable power solution.