Third Edition • Second Printing

Operator's Manual

 

 

 

 

 

 

Test One-Speed Winch Operation

1Install a load handling attachment.

2Raise the carriage by firmly grasping the winch handles and rotating them towards the mast.

Result: The winch should operate smoothly, free of hesitation or binding.

3 Lower the carriage by

 

firmly grasping the

down

winch handles and

 

rotating them away

 

from the mast. After

 

lowering to the

 

desired position, turn up

 

the winch handles

 

toward the mast

 

(raise the load) 1/4

 

turn to set the brakes.

 

Result: The winch should operate smoothly, free of hesitation or binding.

FUNCTION TESTS

Test Two-Speed Winch Operation

1Install a load handling attachment.

2Shift the winch to the slow speed.

3Raise the carriage by firmly grasping the winch handles and rotating them towards the mast.

Result: The winch should operate smoothly, free of hesitation or binding.

4 Lower the carriage by

 

firmly grasping the

down

winch handles and

 

rotating them away

 

from the mast. After

 

lowering to the

up

desired position, turn

 

the winch handles

 

toward the mast

 

(raise the load) 1/4

 

turn to set the brakes.

 

Result: The winch should operate smoothly, free of hesitation or binding.

5Shift the winch to the fast speed and repeat steps 3 and 4.

Test Mast Sequencing

1Install a load handling attachment.

2Raise the carriage to full height by firmly grasping the winch handles and rotating them towards the mast.

Result: The carriage should raise to the top of the front mast section, followed in consecutive order by each mast section.

3Fully lower the carriage. After lowering to the desired position, turn the winch handles toward the mast (raise the load) 1/4 turn to set the brakes.

Part No.97550

Genie Superlift Advantage

13

Page 15
Image 15
Genie 97550 manual Test One-Speed Winch Operation, Test Two-Speed Winch Operation, Test Mast Sequencing