Transferring from Generator Power to Utility Power:

1.On the Power Center, turn OFF Generator MAIN breaker and turn ON Utility MAIN breaker. On 200 amps Main breaker models, this will require sliding the interlock mechanism up with the left hand while turning ON the 200 amp circuit breaker.

2.Turn ON any branch circuit breakers in the Power Center and Main Load center that are OFF.

3.Shut down the generator, following the procedures in the generator Owner’s Manual.

4.Unplug the power cord from the Power Center and then the generator.

5.Let the generator cool down before storing in a dry, secured location.

6.To ensure that your generator will work properly when you need it, it is important to start and run your generator under load regularly and keep the tank filled with fresh fuel. Perform the above steps at least ONCE A MONTH to keep the generator properly “exercised.”

TABLE 2 - Wire Connector Usage Chart:
WIRE SIZE

12

10

8

6

14

Red

NA

NA

NA

12

Red

Red

NA

NA

10

NA

Red

NA

NA

8

NA

NA

Blue

Blue

6

NA

NA

Blue

Blue

TABLE 3 – Compatible Circuit Breaker Types:
Compatible GFCI, Arc-Fault/ Surge Protection Circuit Breakers:

Siemens QP, QT, QPH, HQP, QPF, QPHF, QFP, QE, QEH

Siemens: QPF (GFCI), QAF (Arc Fault), QP (Surge Protector)

Cutler Hammer/Westinghouse Series BD, BR, BQ, GFC

 

Challenger Type A, C, HAGF

 

Square D Series HOM

 

GE Series THQL

 

WIRING DIAGRAMS:

Gen/Tran Corporation

P.O. Box 1001, Alpharetta, GA 30009-1001

Toll Free: 1-888-GEN-TRAN Fax: 770-552-7756

www.gen-tran.com

© 2003 Gen-Tran Corporation. All Rights Reserved. PowerStay is a trademark of Gen-Tran CorporationPN XXXXX Rev A 6-12-03 4